Similar Projects
Continental Mill Riverwalk Path
Infrastructure
Conception
$391,000 est. value
Lewiston, ME

Main Street Fire Station Replacement Project - City of Lewiston
Demolition, New Construction, Infrastructure
Conception
$4,002,093 CJ est. value
Lewiston, ME 04240

Picker House Lofts
Infrastructure, Renovation
Design
$22,400,000 CJ est. value
Lewiston, ME 04240

Picker House Lofts
Infrastructure, Renovation
Design
$22,400,000 CJ est. value
Lewiston, ME 04240

Hall and Coburn Streets Water Main Replacement and Road Rehabilitation
Infrastructure
Bidding
$196,000 CJ est. value
Lewiston, ME 04240

Hall and Coburn Streets Water Main Replacement and Road Rehabilitation
Infrastructure
Bidding
$196,000 CJ est. value
Lewiston, ME 04240

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Ferry Road Roadway Improvements
Infrastructure
Post-Bid
$430,000 est. value
Lisbon, ME 04250

Intersection Improvements
Results
Auburn, ME 04210

Statewide Geotechnical Drilling
Infrastructure
Results

Strawberry Avenue Self-Storage
New Construction, Infrastructure - 28,400 SF
Pending Verification
$3,000,000 CJ est. value
Lewiston, ME 04240

Residence at Great Falls
New Construction, Infrastructure
Pending Verification
$40,000,000 CJ est. value
Lewiston, ME 04240

Canal Street Parking Garage Building Repairs - City of Lewiston
Renovation, Infrastructure
Conception
$600,000 CJ est. value
Lewiston, ME 04240

Walgreens - Main Street / Lewiston
New Construction, Infrastructure - 3,834 SF
Design
$825,000 CJ est. value
Lewiston, ME 04240

Hot Mix Shimming and Surface Paving
Infrastructure
Post-Bid
$250,000 est. value
Turner, ME

Last Updated 07/19/2023 03:17 PM
Project Title

55 North Temple Street Pickleball Courts

Physical Address View project details and contacts
City, State (County) Lewiston, ME 04240   (Androscoggin County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Park/Playground, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Results, Construction start expected August 2023
Bids Due View project details and contacts
Estimated Value $293,872 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The work for the 55 NORTH TEMPLE STREET PICKEBALL COURTS shall consist of, but not be limited to, the complete and satisfactory construction of installation of: - 0.8 Acre Clearing & Grubbing - 1,600 SY Fine Grading - 130 Tons of Machine-Placed 9.5mm HMA - 1,100 SY Mirafi 140N - 110 CY Reclaim Asphalt - 350 CY Aggregate Base - 201 CY Aggregate Subbase - 2,100 SY Loam, Seed & Mulch - 1, 4 FT Dia. Outlet Control Structure - 50 FT 10" ADS N-12 HDPE Pipe - 10 FT, 12" SDR35 PVC Pipe - 280 FT, 4" Perforated PVC Underdrain - 386 FT, Chainlink Fence Work will include the construction of paved pickleball courts, finished with a textured, acrylic, color surface (blue & green), and surrounded by perimeter fencing. The access drive and parking area will be a layer of reclaim asphalt, with a 15-ft paved driveway apron at North Temple Street. The existing North Temple Street sidewalk will be modified for slipform concrete curb tipdowns on each side of the access drive. Stormwater infrastructure will include underdrains, a culvert, stormwater detention pond with outlet control structure & rip-rap level lip spreader. Landscaping features include a buffer comprised of two, staggered rows of evergreens along the North Temple Street frontage. No Proposal will be considered unless it is accompanied by a bid security in the form of a bid bond or certified check in the amount of ten percent (10%) of the total bid price, made out in favor of the City of Lewiston. All bid securities will be released upon deliverance of a signed Contract or, if no Contract award is made, within forty-five (45) days after the opening of the Proposals, unless forfeited as herein stipulated. A Performance Bond and a Labor and Material Payment Bond, preferably executed on AIA Bond Form Number A311, in an amount equal to the total Contract price, of a surety company satisfactory to the Purchasing Agent, will be required of the successful bidder to ensure completion of the work and the proper fulfillment of the conditions of the Contract. The total Contract price shall mean the total bid price as stated in the Proposal based on the estimated quantities of the various items of work. Work, including over-winter loaming & seeding, paving, and stormwater detention pond, must be completed by November 15, 2023. Final loaming & seeding & court painting/striping must be completed by May 1, 2024. Committee reserves the right to accept any Proposal or reject any or all Proposals if it is deemed to be in the public interest to do so. Question Deadline 07/13/2023 Questions and Requests for Information shall be submitted to Faith Thomas (fthomas@lewistonmaine.gov) on Questions and RFIs will be responded to via email to potential bidders on the Plan Holders List and those registered with the City Purchasing Department for this project.

Details

Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 31 - Earthwork, Selective Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents