Similar Projects
Bone Marrow Fan Replacement - Division 01 - General Work
Alteration
Bidding
$200,000 est. value
Chicago, IL 60612

Bridge Elementary School Window A/C Replacement
Alteration
Sub-Bidding
$200,000 est. value
Chicago, IL 60634

Harper College - Building Z Refrigerant Detection
Post-Bid
Palatine, IL 60067

OA Dampers at Bridge ES
Post-Bid
Chicago, IL 60634

HVAC Replacements at Sand Ridge Nature Center
Results
South Holland, IL 60473

Hamilton Elementary School - LBP Mitigation and ACM Patch and Repair in the Ventilation System
Results
Chicago, IL 60657

HVAC and Mechanical Products
Term Contract
Post-Bid

Replacement of Rotunda Air Handling Units
Results
Chicago, IL

CTE Mechanical Equipment at Prospect HS
Post-Bid
Mount Prospect, IL 60056

Damper Replacement Graham ES
Results
Chicago, IL 60609

Robert Crown Center HVAC Maintenance
Post-Bid
Evanston, IL 60202

Saucedo ES-Air Damper Replacement
Results
Chicago, IL 60623

Upgrade Mechanical Systems
Post-Bid
Less than $250,000 est. value
River Grove, IL 60171

Bridge ES Filter Racks AHU #1, AHU #2
Results
Chicago, IL 60634

Building Automation Systems-Wentworth
Term Contract
Post-Bid
$250,000 est. value
Chicago, IL 60609

Last Updated 05/16/2022 05:04 PM
Project Title

ComEd Vault Ventilation (Construction)

Physical Address View project details and contacts
City, State (County) Chicago, IL 60612   (Cook County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Pre-Solicitation, Construction Commenced April 2022
Bids Due View project details and contacts
Estimated Value $100,000 to $250,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Jesse Brown VA Medical Center has a requirement for corrections to the ComEd Vault Ventilation located at Building 15. Work shall include complete HVAC systems. The contractor shall provide supervision, labor, material, equipment, machinery, and items necessary in accordance with provided construction documentation. The Period of Performance is Two Hundred and Eleven (211) calendar days from the Notice to Proceed (NTP).

Details

Division 02 - Existing Conditions, Subsurface Investigation, Facility Remediation.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Systems, HVAC Air Distribution, Ventilation Hoods, Central Heating Equipment, Central Cooling Equipment, Central HVAC Equipment, Decentralized HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents