Similar Projects
Bayles Lake HOA - Refurbishment Of Existing Hydropneumatic Storage Tank
New Construction, Infrastructure
Bidding
Loda, IL

0.75 MG Central Water Tower
Infrastructure
Bidding
North Aurora, IL

Z2NE--Upgrade Facility Water - Smith Hafeli Inc - MA VA Medical Center
Post-Bid
Marion, IL

Water Tower Cleaning
Term Contract
Post-Bid
Oswego, IL 60543

Elevated Water Storage Tank
Results
Gardner, IL 60424

Elevated Tank Improvements
Results
Pecatonica, IL 61063

Water Tower Cleaning
Post-Bid
Colona, IL

State Street And Seven Hills Elevated Water Storage Tanks Rehabilitation
Renovation
Results
O'Fallon, IL 62269

New 250,000 Gallon Elevated Water Storage Tank
Post-Bid
Less than $1,310,000 est. value
Carrollton, IL

Water Tank, Hydronic Pump and Vav Box Upgrades at Independence Grove
Results
Libertyville, IL 60048

Protective Coating Restoration for 500,000 Gallon Elevated Water Storage Reservoir Along with Ground Storage Reservoir and Miscellaneous Concrete at Water Treatment Plant
Post-Bid
Centralia, IL

First Street Water Treatment Plant Brine Tank Replacement
Renovation
Results
Less than $480,000 est. value
Woodstock, IL 60098

Water System Improvements Division 2: Water Tower Rehabilitation
Post-Bid
Blue Mound, IL

Southwest Elevated Tank Repairs
Results
Less than $440,000 est. value
Belvidere, IL 61008

100,000 Gallon Elevated Tank Rehabilitation
Post-Bid
Marion, IL

Last Updated 06/30/2021 01:51 PM
Project Title

Industrial Park and Water Plant Elevated Water Tanks Maintenance

Physical Address View project details and contacts
City, State (County) Rock Falls, IL 61071   (Whiteside County)
Category(s) Sewer and Water
Sub-Category(s) Storage/Water Tanks
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $230,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Industrial Park Elevated Tank 1.Power wash tank exterior. 2.Spot paint repairs of tank exterior. 3.Replacement of access tube bug screen. Water Plant Elevated Tank 1.Power wash tank exterior. 2.Spot paint repairs of tank roof exterior. 3.Spot paint repairs of dry interior. 4.Removal and replacement of fill pipe. 5.Removal and replacement of draw pipe. 6.Removal and replacement of overflow pipe. 7.Full, 3-coat paint system on new piping. 8.Install new expansion joint on fill and draw pipes. 9.Install new insulation and jacketing on fill and draw pipes. 10.Remove and replace mud valve. 11.Remove and replace pit and site piping. 12.Install portable water salesman. Both Elevated Tanks 1.Disinfection and filling of tanks. 2.Proper containment and disposal of materials.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents