Similar Projects
Lift Station Renovations No.7, for the Department of Environmental and Engineering Services (DEES)
Renovation
Bidding
$200,000 est. value
Margate, FL

Utility Analysis Zone 108
New Construction, Infrastructure
Post-Bid
$21,504,000 est. value
Pompano Beach, FL 33060

Rehabilitation of Lift Station 22A, 21D, and New Force Main
Renovation, Infrastructure
Post-Bid
Coral Springs, FL

Wastewater Lift Station 25
New Construction
Results
Less than $412,000 est. value
Deerfield Beach, FL 33441

B-22 Pumping Station Replacement
Results
Fort Lauderdale, FL 33301

Accelerates Cleaning and Upgrades
Renovation
Post-Bid
Dania Beach, FL 33004

Tract 27 Booster Station Upgrades Project
Results
Less than $1,755,000 est. value
Tamarac, FL 33321

Sewer Lift Station Valve Vault Rehabilitation
Renovation
Post-Bid
$300,000 est. value
Weston, FL 33327

SW 130th Avenue Force Main and Lift Station 309 Improvements
Results
Davie, FL 33024

Sewer Lift Station Rehabilitation and Repair
Term Contract
Results
FL

Replacement of Lift Station - 15
New Construction
Results
Pembroke Park, FL 33023

Sewage Lift Station Rehabilitation At Station Ft. Lauderdale
Renovation
Results
Dania Beach, Fort Lauderdale, FL 33004

Lift Station No. 3 Replacement Project
Renovation
Results
$790,000 est. value
Plantation, FL 33324

S9 and S9a Trash Rake and Pump Station Refurbishments
Renovation
Results
Fort Lauderdale, Southwest Ranches, FL 33317

Lift Station 14A Force Main Replacement
Renovation, Infrastructure
Results
Coral Springs, FL

Reported 06/04/2022 12:00 AM
Project Title

D/B - Design Build Flagler Village New Pumping Station A-24

Physical Address View project details and contacts
City, State (County) Fort Lauderdale, FL   (Broward County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs), Construction Start Expected January 2023
Bids Due View project details and contacts
Estimated Value $540,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Design-Build Firm (DBF) responsible for the design, permitting, construction, testing and startup of Design Build Flagler Village New Pumping Station A-24. The work to be accomplished under this contract includes, but is not limited to; the design, permitting, and construction of the Pumping Station A-24 Flagler Village project., including all other aspects of the project to fulfill the intent of the Project as described in the Design Criteria Package and all supporting documents. Design-Build Firms who are interested in submitting Statements of Qualification (SOQ) in response to this RFP shall comply with Section IV - Submittal Requirements. Enter total proposal "contract price" as stated on the price proposal forms. NOTE: Payment on this contract will be made by Visa or Mastercard.

Details

Lift and Pump Stations, New Construction.
Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents