Similar Projects
Armor Joint Repairs and Joint Sealing on Various Roads and Bridges, Precinct 3
Results
Houston, TX

Driveway Resurface Project
Results
$100,000 to $250,000 est. value
Denton, TX 76209

Blanco Road Phase II
Results
$19,200,000 est. value
San Antonio, TX 78207

2019-2020 Microsurface Toc Package 1
Results
$3,000,000 est. value
San Antonio, TX

Harvest Townside Phase 2 Paving
Results
TX

Harvest Townside Phase 2 Mass Grading
Results
TX

Southern Region Disaster Recovery Support BPA
Results

Last Updated 11/06/2020 03:10 AM
Project Title

Widen Shoulders and Overlay

Physical Address View project details and contacts
City, State (County) TX   (Archer County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $5,506,557
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

100 6002 Preparing Row Sta 5.000 1 110 6001 Excavation (Roadway) Cy 7,126.000 2 132 6004 Embankment (Final)(Dens Cont)(Ty b) Cy 15,654.000 3 161 6017 Compost Manuf Topsoil (4") Sy 77,738.000 4 162 6002 Block Sodding Sy 2,640.000 5 164 6009 Broadcast Seed (Temp) (Warm) Sy 38,869.000 6 164 6011 Broadcast Seed (Temp) (Cool) Sy 38,869.000 7 164 6033 Drill Seeding (Perm) (Rural) (Sandy) Sy 77,738.000 8 168 6001 Vegetative Watering Mg 657.000 9 169 6004 Soil Retention Blankets (Cl 1) (Ty d) Sy 8,765.000 10 275 6001 Cement Ton 420.000 11 275 6011 Cement Treat(Exist Matl)(8") Sy 38,869.000 12 310 6009 Prime Coat (Mc-30) Gal 9,721.000 13 316 6017 Asph (Ac-20-5tr) Gal 38,481.000 14 316 6249 Aggr(Ty-Pe Gr-4 Sac-b) Cy 891.000 15 346 6014 Stone-Mtrx-Asph Sma-d Sac-a Pg76-22 Ton 14,968.000 16 351 6002 Flexible Pavement Structure Repair(6") Sy 2,917.000 17 351 6027 Flex Pavement Structure Repair (2.5") Sy 1,494.000 18 354 6002 Plan & Text Asph Conc Pav(0" To 2") Sy 1,244.000 19 460 6002 Cmp (Gal Stl 18 In) Lf 135.000 20 462 6045 Conc Box Culv (3 Ft x 2 Ft)(Extend) Lf 58.000 21 462 6049 Conc Box Culv (4 Ft x 4 Ft)(Extend) Lf 62.000 22 462 6052 Conc Box Culv (5 Ft x 4 Ft)(Extend) Lf 25.000 23 462 6054 Conc Box Culv (6 Ft x 3 Ft)(Extend) Lf 66.000 24 466 6192 Wingwall (Pw - 2) (Hw=3 Ft) Ea 4.000 25 466 6193 Wingwall (Pw - 2) (Hw=4 Ft) Ea 2.000 26 466 6194 Wingwall (Pw - 2) (Hw=5 Ft) Ea 4.000 27 467 6348 Set (Ty Ii) (18 In) (Cmp) (6: 1) (p) Ea 10.000 28 496 6004 Remov Str (Set) Ea 10.000 29 496 6005 Remov Str (Wingwall) Ea 10.000 30 496 6007 Remov Str (Pipe) Lf 125.000 31 500 6001 Mobilization Ls 1.000 32 502 6001 Barricades, Signs And Traffic Handling Mo 12.000 33 506 6002 Rock Filter Dams (Install) (Ty 2) Lf 160.000 34 506 6011 Rock Filter Dams (Remove) Lf 160.000 35 506 6038 Temp Sedmt Cont Fence (Install) Lf 9,580.000 36 506 6039 Temp Sedmt Cont Fence (Remove) Lf 9,580.000 37 506 6040 Biodeg Erosn Cont Logs (Instl) (8") Lf 1,320.000 38 506 6043 Biodeg Erosn Cont Logs (Remove) Lf 1,320.000 39 530 6004 Driveways (Conc) Sy 180.000 40 530 6005 Driveways (Acp) Sy 661.000 41 530 6008 Turnouts (Acp) Sy 33.000 42 533 6001 Rumble Strips (Shoulder) Lf 43,729.000 43 533 6002 Rumble Strips (Centerline) Lf 26,665.000 44 560 6011 Mailbox Install-s (Tww-Post) Ty 4 Ea 1.000 45 644 6001 In Sm Rd Sn Sup&Am Ty10bwg(1)Sa(p) Ea 2.000 46 644 6030 In Sm Rd Sn Sup&Am Tys80(1)Sa(t) Ea 1.000 47 644 6060 In Sm Rd Sn Sup&Am Tytwt(1)Ws(p) Ea 8.000 48 644 6061 In Sm Rd Sn Sup&Am Tytwt(1)Ws(t) Ea 3.000 49 644 6071 Relocate Sm Rd Sn Sup&Am Ty Twt Ea 1.000 50 644 6076 Remove Sm Rd Sn Sup&Am Ea 14.000 51 658 6048 Instl Om Assm (Om-2z)(Flx)Gnd Ea 26.000 52 662 6109 Wk Zn Pav Mrk Sht Term (Tab)Ty w Ea 1,388.000 53 662 6110 Wk Zn Pav Mrk Sht Term (Tab)Ty y Ea 3,860.000 54 666 6006 Refl Pav Mrk Ty i (w)4"(Dot)(100mil) Lf 665.000 55 666 6170 Refl Pav Mrk Ty Ii (w) 4" (Sld) Lf 43,278.000 56 666 6205 Refl Pav Mrk Ty Ii (y) 4" (Brk) Lf 75.000 57 666 6207 Refl Pav Mrk Ty Ii (y) 4" (Sld) Lf 130,678.000 58 666 6300 Re Pm w/Ret Req Ty i (w)4"(Brk)(100mil) Lf 3,270.000 59 666 6303 Re Pm w/Ret Req Ty i (w)4"(Sld)(100mil) Lf 43,728.000 60 666 6312 Re Pm w/Ret Req Ty i (y)4"(Brk)(100mil) Lf 75.000 61 666 6315 Re Pm w/Ret Req Ty i (y)4"(Sld)(100mil) Lf 52,388.000 62 668 6083 Prefab Pav Mrk Ty c (w) (Lndp Arrow) Ea 4.000 63 672 6007 Refl Pav Mrkr Ty i-c Ea 165.000 64 672 6009 Refl Pav Mrkr Ty Ii-a-a Ea 1,311.000 65 677 6005 Elim Ext Pav Mrk & Mrks (12") Lf 1,640.000 66 3076 6001 d-Gr Hma Ty-b Pg64-22 Ton 12,025.000 67 3084 6001 Bonding Course Gal 10,351.000 68 6185 6002 Tma (Stationary) Day 178.000 69 6185 6005 Tma (Mobile Operation) Day 20.000 70

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents