Similar Projects
M-451(226) 25th Street, Benjamin Avenue to Eisenhower - City of Norfolk
Infrastructure
Conception
$2,175,000 CJ est. value
Norfolk, NE 68701

West Plant Transfer Pump Upgrade - City of Norfolk
Renovation
Conception
$360,240 CJ est. value
Norfolk, NE 68701

Soybean Processing Facility / Norfolk
New Construction, Infrastructure
Design
$375,000,000 CJ est. value
Norfolk, NE 68701

Indoor Aquatic Center - City of Norfolk
New Construction, Infrastructure - 54,000 SF
Design
$32,500,000 CJ est. value
Norfolk, NE 68701

Proposed Additions and Renovations to the Existing Building
Addition, Demolition, Renovation, Infrastructure
Bidding
$1,000,000 CJ est. value
Norfolk, NE 68701

Improvements for West Michigan Avenue and 8th Street Street and Utility Improvements
Infrastructure
Bidding
$3,000,000 CJ est. value
Norfolk, NE 68701

Water Pollution Control Plant Improvements
New Construction, Infrastructure
Post-Bid
$6,881,143 CJ est. value
Norfolk, NE 68701

Water Pollution Control Plant Improvements
New Construction, Infrastructure
Post-Bid
$6,881,143 CJ est. value
Norfolk, NE 68701

District 3 On-Call Util Location Service 2019 D3 District wide ER Event
Infrastructure
Results
Less than $5,000,000 est. value

Orphan Grain Train Warehouse Expansion
New Construction, Infrastructure - 20,000 SF
Pending Verification
$6,500,000 CJ est. value
Norfolk, NE 68701

Bridges Repair County of Madison
Infrastructure, Renovation
Pending Verification
$500,000 CJ est. value
Norfolk, NE 68701

1MG Finished Water Tank - City of Norfolk
Infrastructure
Conception
$1,312,500 CJ est. value
Norfolk, NE 68701

Norfolk Northeast Industrial Utility Extension
Renovation, Infrastructure
Bidding
$2,500,000 CJ est. value
Norfolk, NE 68701

Bid Package #1 for the New Addition and Renovation to the Battle Creek Elementary and High School
Addition, Renovation, Infrastructure
Post-Bid
$8,500,000 CJ est. value
Battle Creek, NE 68715

West Treatment Plant Upgrades - City of Norfolk
Renovation
Conception
$840,000 CJ est. value
Norfolk, NE 68701

Last Updated 01/03/2023 03:31 PM
Project Title

Raw Lift Pipe and Valveing Replacement - City of Norfolk

Physical Address View project details and contacts
City, State (County) Norfolk, NE 68701   (Madison County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Sewage Treatment Plant, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $500,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

A detailed scope has not yet been determined. This project is included in the city's FY 2023-2032 Capital Improvement Plan. As of January 3, 2023, further details regarding design and construction have not been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents