Similar Projects
Coliseum Medical Centers Freestanding Emergency Department
New Construction, Infrastructure
Conception
$11,928,250 CJ est. value
Bonaire, GA 31005

Entrance Drive into Creekwood Park
Infrastructure
Bidding
$300,000 CJ est. value
Perry, GA 31069

Entrance Drive into Creekwood Park
Infrastructure
Bidding
$300,000 CJ est. value
Perry, GA 31069

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Mass Paving
Infrastructure
Results
GA

Mass Paving
Infrastructure
Results
GA

CRH Healthcare Shell Building / Bonaire
New Construction, Infrastructure - 4,000 SF
Construction
$800,000 CJ est. value
Bonaire, GA 31005

Perry-Houston County Airport - City of Perry
Infrastructure
Pending Verification
$2,000,000 CJ est. value
Perry, GA 31069

Bob White Storage Expansion / Perry
Addition, Demolition, Renovation, Infrastructure
Pending Verification
$500,000 CJ est. value
Perry, GA 31069

Starbucks Shell / Bonaire
New Construction, Infrastructure - 2,500 SF
Bidding
$1,000,000 CJ est. value
Bonaire, GA 31005

Trellis Walk Full Depth Reclamation and Resurfacing
Post-Bid
Centerville, GA 31028

Valve and Meter Boxes
Term Contract
Results
Warner Robins, GA

Ashley Drive Multi-Residential Development
New Construction, Infrastructure
Pending Verification
$93,000,000 CJ est. value
Perry, GA 31069

Perry Fieldhouse Site Improvements
Infrastructure
Post-Bid
GA

Last Updated 04/27/2023 09:13 AM
Project Title

Lake Joy Primary and Elementary Site Upgrades

Physical Address View project details and contacts
City, State (County) Warner Robins, GA 31088   (Houston County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $467,071 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

E-Verify Requirement: All bidders shall provide their signed E-Verify affidavit with their bid. Bids will not be considered without the Contractor affidavit. The successful bidder is responsible for obtaining a signed E-verify affidavit from their Subcontractors and Sub-subcontractors. The work to be done consists of furnishing all materials, equipment and labor necessary to complete the site improvements as shown on the construction drawings. The work shall be installed as detailed on the construction drawings and specified herein and all incidental work required for a complete and functional installation. Work shall include but not be limited to new asphalt roadway, asphalt overlays, concrete curb and gutter, sidewalk and storm infrastructure. Contractors are responsible for traffic control and erosion control. All construction shall comply with the City of Warner Robins Standard Specifications. The successful bidder, if awarded the Contract, will be required to furnish a Performance Bond in the amount of one hundred percent (100%) of the Contract amount and a Payment Bond in the amount of one hundred percent (100%) of the Contract amount. License: The Bidder shall hold a current Contractor's License and a Utility Manager License issued by the Georgia State Construction Industry Licensing Board. Owners Right: The Houston County School District reserves the right to reject any or all bids, to waive any technicalities and informalities and re-advertise. The Houston County School District further reserves the right to award this contract in whole or in part.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents