Similar Projects
Alternative Liner Pipe Material (CIPP)
Term Contract
Post-Bid

Haven Water and Sewer Improvement Project
Post-Bid
Less than $285,000 est. value
Ravenna, OH 44266

Student Recreation and Wellness Center Chilled Water Extension
Results
Less than $711,900 est. value
Kent, OH 44242

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

Water System Improvements - Distribution System Phase II
Results
Less than $348,900 est. value
Windham, OH 44288

2019 - East Pioneer Trail Watermain Replacement Project
Results
Less than $2,650,000 est. value
Aurora, OH 44202

Water Reclamation Facility Primary Clarifier No. 2 Improvements
Results
Less than $457,700 est. value
Kent, OH 44240

Automatic Read Water Meters
Results
Mantua, OH 44255

Streetsboro State Route 14 Water Main Replacement
Results
Streetsboro, OH

Lawrence Street Water and Sidewalk Improvements
Results
Less than $532,432 est. value
Ravenna, OH 44266

AMI Water Meter System
Results
Ravenna, OH 44266

2020 Walden Drive Water Main Replacement Project
Results
Less than $62,970 est. value
Aurora, OH 44202

Meter Reading System Replacement
Results
Less than $475,000 est. value
Hiram, OH 44234

Community Park Water Service
Results
Less than $176,005 est. value
Rootstown, OH 44272

Garfield Road Water Main Replacement
Results
Hiram, OH

Reported 06/18/2021 12:00 AM
Project Title

Water System Improvements Phase II

Physical Address View project details and contacts
City, State (County) Windham, OH   (Portage County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines, Water Treatment Plant
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value $549,000
Plans Available from Engineer - 05/20/21
Owner View project details and contacts
Architect View project details and contacts
Description

The work covered by the Contract Documents includes all labor and materials for removal of the existing Potassium Permanganate tanks and feed pumps, rebuild of 15 filter valves and 12 softener valves, install new limit switches on the 27 rebuilt valves and 2 existing valves, new magnetic flow meter, new combination magnetic starters and panels for six wells and integration with the existing RTUs, installation of three pole-mounted transformers plus one spare, one new pad-mounted manual transfer switch, new riser pole assembly installation, new clearwell back-up float switches, new additional I/O modules and wiring at the filter PLC related to the valves limit switches and miscellaneous items, and SCADA data base reconfiguration for instruments/actuators.

Details

Division 02 - Existing Conditions, Geotechnical Investigations, Subsurface Drilling and Sampling.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Windows, Hardware, Glazing.
Division 09 - Finishes, Flooring, Painting and Coating.
Division 10 - Specialties, Signage, Safety Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings.
Division 13 - Special Construction.
Division 14 - Conveying Equipment, Lifts.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Air Terminal Units.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exterior Lighting.
Division 27 - Communications, Data Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 40 - Process Integration, Water Process Piping, Instrumentation and Control for Process Systems.
Division 41 - Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Conveying Equipment, Bulk Material Feeders, Conveyors, Cranes and Hoists.
Division 44 - Pollution and Waste Control Equipment, Odor Treatment Equipment, Water Pollution Control Equipment, Water Pollution Containment and Cleanup Equipment.
Division 46 - Water and Wastewater Equipment, Common Work Results for Water and Wastewater Equipment, Water and Wastewater Preliminary Treatment Equipment, Water and Wastewater Chemical Feed Equipment, Water and Wastewater Clarification and Mixing Equipment, Water and Wastewater Secondary Treatment Equipment, Water and Wastewater Advanced Treatment Equipment, Water and Wastewater Residuals Handling and Treatment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents