Similar Projects
OR DOT 140(1), Klamath County Boat Marina to Lakeshore Drive
Infrastructure, Alteration
Design
$20,000,000 est. value
Klamath Falls, OR 97601

I-84: I-205 - Marine Drive Section of the Columbia River Highway
Infrastructure
Bidding
$5,000,000 to $10,000,000 est. value
OR

Salmonberry Drive Paving Project
Infrastructure
Bidding
$200,000 est. value
Oregon City, OR 97045

OR58 (018) MP35 Paving (Oakridge)
Infrastructure
Post-Bid
Oakridge, OR

OR DOT CRGNSA 100(6), Historic Columbia River Highway State Trail
Term Contract, Alteration
Post-Bid
Hood River, OR

Canby And East Streets Watermain Replacement
Infrastructure, Alteration
Results
$450,000 to $500,000 est. value
Klamath Falls, OR 97625

US97: OR58 - California Border Project the Dalles-California Hwy Tom Feeley, Pm
Infrastructure
Results
OR

2022 City Streets Overlay and Reconstruction Project
Infrastructure
Bidding
Pendleton, OR

Pothole Repairs
Alteration
Post-Bid
$80,000 est. value
Coos Bay, OR

US 20 Ward - Hamby Road Intersection
Infrastructure
Results
$2,000,000 to $5,000,000 est. value
Bend, OR 97701

Errol Heights
Infrastructure
Bidding
Portland, OR 34997

Granite Hill Road Reconstruction
Alteration
Post-Bid
$7,000,000 to $10,000,000 est. value
Sumpter, OR

US97 - Redmond - Bend Project the Dalles-California Hwy
Infrastructure
Results
$2,000,000 to $5,000,000 est. value
Redmond, OR

Madison Street Improvements Project
Infrastructure
Bidding
Lafayette, OR 97127

Juniper Ridge Public Works Campus Project
Alteration
Post-Bid
Bend, OR

Reported 03/31/2022 12:00 AM
Project Title

Boeckman Road Corridor Project

Physical Address View project details and contacts
City, State (County) Wilsonville, OR 97070   (Clackamas County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Design-Build. Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value $26,000,000 to $28,000,000
Plans Available from Municipal Agency - 02/14/22
Owner View project details and contacts
Architect View project details and contacts
Description

provide Progressive Design Build (PDB) services for design and construction of the Boeckman Road Corridor Project (BRCP). The BRCP includes four interrelated funded public works projects on Boeckman Road between Canyon Creek Road and Wilsonville/Stafford Roads in northeast Wilsonville. The four "subprojects" to be combined are: The Boeckman Dip Bridge project (CIP 4212) will construct a bridge over Boeckman Creek and will make needed safety improvements and upgrade the existing steep, narrow, rural roadway to a minor arterial standard with safe bicycle and pedestrian facilities that connect residential neighborhoods, jobs, schools, and commercial land uses. The design will provide for steam/riparian restoration, fish passage, wildlife corridor and a regional trail. This improvement also facilitates construction of the Canyon Creek intersection by correcting the vertical curve and site distance issues. A road closure for bridge construction will require a temporary traffic signal at the Stafford Road/ SW 65th Avenue/ Elligsen Road intersection to mitigate additional impacts to the intersection which currently experiences LOS constraints. Preliminary design (see appendix 9.3) of the 65/Stafford intersection is currently underway. The City is in discussions with both Clackamas and Washington County to finalize agreements and secure approval for the signal installation. A hydraulic/ hydrologic analysis of Boeckman Creek has been completed to assess downstream impacts of eliminating the detention that currently exists north of Boeckman Road (see appendix 9.2). The Boeckman Road Sanitary Sewer Improvements (CIP 2012) project will construct approximately one-half mile of new sanitary sewer trunk on Boeckman Road between Boeckman Creek on the west and Stafford Road on the east to serve the developing Frog Pond neighborhoods. The new sewer will connect existing temporary sewer connections for Frog Pond West and Meridian Creek Middle School on Advance Rd. The Boeckman Road Street Improvements (CIP 4205) will improve the existing roadway with multi-modal improvements meeting Minor Arterial design standards between Boeckman Creek and Stafford Road, underground existing utilities, extend city fiber, provide safe pedestrian crossing at SW Willow Creek Drive The Canyon Creek Road/Boeckman Road Signalization project (CIP 4206) will construct a new traffic signal at the intersection of Canyon Creek Road and Boeckman Road. The city will also consider a roundabout at the intersection if LOS issues can be resolved, construction traffic can be appropriately mitigated, and cost is determined to be within budget.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents