Similar Projects
Hydraulic Pumps, Cylinders, Motors and Related Services
Term Contract
Post-Bid
Salt Lake City, UT

Temporary Heating Systems
Post-Bid
Salt Lake City, UT

J--NIIP B2.9L Unit 4 Motor Rewind and Reconconditioni
Results
Salt Lake City, UT 84044

Salt Lake Sports Complex Ammonia Chiller Replacement
Results
$300,000 to $500,000 est. value
Salt Lake City, UT 84108

Annual Contract for Plumbing/Mechanical Work
Term Contract
Post-Bid
Salt Lake City, UT 84115

Children's Center Boiler Replacement Family Health Building Department of Health
Results
$450,000 est. value
Salt Lake City, UT

Riverton High School Boiler Replacement
Term Contract
Results
Riverton, UT 84065

DFCM Construction-Pre Qualified Mechanical-Utah National Guard Mechanical Upgrades Draper JFHQ Building
Results
Less than $292,000 est. value
Draper, UT 84020

Salt Lake City (SLC) Cooling Tower Mechanical Separator
Results
$25,000 to $50,000 est. value
Salt Lake City, UT

Adult Detention Center Water Heater Replacement
Results
$100,000 to $130,000 est. value
UT

Boiler Remodel for Draper City
Results
Draper, UT 84020

CAB West Mechanical Make-up and Exhaust
Term Contract
Results
Granite, Sandy, UT 84070

Boiler and Motor Pumps Upgrade
Results
Less than $600,000 est. value
Salt Lake City, UT 84114

Construction-Pre Qualification-General/Mechanical/Electrical/Roofing/Pavingcontractors
Results
Less than $3,500,000 est. value
Salt Lake City, UT

SLCC Mechanical Controls Upgrade
Results
$600,000 est. value
Salt Lake City, UT 84130

Last Updated 04/24/2019 05:09 PM
Project Title

SLCC MC - Boiler Replacement

Physical Address View project details and contacts
City, State (County) Sandy, UT 84070   (Salt Lake County)
Category(s) Single Trades
Sub-Category(s) Mechanical
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $225,000
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description 1. Furnish all labor, materials, and equipment necessary for the completion of the mechanical and plumbing scope of work. 2. Furnish and install all motors specified in this Division and be responsible for the proper operation of electrical powered equipment furnished by this Division. 3. Furnish exact location of electrical connections and information on motor controls to Division 26. 4. Mechanical Contractor shall obtain the services of independent Test and Balance Agency. 5. Placing the air conditioning, heating, ventilating, and exhaust systems into full operation and continuing their operation during each working day of testing and balancing. 6. Making changes in pulleys, belts, and dampers, or adding dampers, as required for the correct balance as recommended by Balancing Contractor at no additional cost to Owner. 7. Air balance, final adjustment and test run. 8. The satisfactory performance of the completed systems is a requirement of this specification.
Details
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Heating Boilers.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents