Similar Projects
Hydrogen-Powered Aviation Facility
New Construction, Infrastructure
Conception
Everett, WA 98204

Paine Field Office and Research Space
Renovation
Conception
$5,500,000 est. value
Everett, WA 98204

South Lake Union the Mercer Blocks
New Construction - 890,000 SF
Design
$20,000,000 est. value
Seattle, WA 98109

Kaiser Aluminum Lab Expansion
Addition - 2,851 SF
Design
$400,000 est. value
Spokane, Spokane Valley, WA 99216

RFQ D/B - Construction of ARS/WSU Plant Bioscience Research Building
New Construction, Infrastructure - 113,703 SF
Bidding
$89,000,000 CJ est. value
Pullman, WA 99163

PDLE Modifications
Demolition, Renovation, Infrastructure
Bidding
$500,000 CJ est. value
Richland, WA 99354

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

Laboratory Support Facility
Renovation, Demolition - 2,700 SF
Post-Bid
Cheney, WA 99004

Lindbergh High School Networking Lab
New Construction
Results
$251,000 est. value
Renton, WA 98058

Kitsap High School Culinary Lab Renovation
Renovation
Results
$290,000 est. value
Silverdale, WA 98383

Alexandria Center for Science and Technology / Bellevue
New Construction, Infrastructure - 716,007 SF
Pending Verification
$250,000,000 CJ est. value
Bellevue, WA 98005

Meta Reality Lab - Building Z
New Construction, Infrastructure - 328,750 SF
Pending Verification
$100,000,000 CJ est. value
Redmond, WA 98052

RFQ D/B - NOAA Manchester Research Facility Seawater System Construction
New Construction
Design
$5,000,000 to $10,000,000 est. value
Port Orchard, WA

Sequim Marine Sciences Laboratory (MSL5) Seismic Upgrades
Renovation
Post-Bid
Sequim, WA 98382

PSL Lab Conversions and Relocation
Renovation
Results
$170,000 est. value
Richland, WA 99354

Last Updated 08/31/2022 06:02 AM
Project Title

Repurpose BIL Construction

Physical Address View project details and contacts
City, State (County) Richland, WA 99354   (Benton County)
Category(s) Laboratory
Sub-Category(s) Laboratory
Contracting Method Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $2,866,840 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The Work consists of renovating the Battelle Inhalation Laboratory (BIL), located on the Richland Research Campus. BIL will be repurposed to create a general-purpose research laboratory space. Repurposing BIL includes, but not limited to, updating the facility mechanical and electrical systems, replacing selected laboratory lighting, reconfiguring interior non-load bearing laboratory walls, demolishing interior doors, replacing ceilings, demolishing the vivarium infrastructure e.g. cage washing unit, autoclave, walk-in refrigeration units, and the floor trenches, and preparing the sloped laboratory floors. The work includes patching and painting interior walls, providing a laboratory fume hood, establishing facility access control, and providing a set of exterior doors and associated concrete landing pad and sidewalk. Also included is the relocation of research materials and equipment from one PNNL laboratory to the renovated BIL and research equipment placement and connection to installed mechanical and electrical services.

Details

Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings, Doors and Frames, Windows, Vents.
Division 09 - Finishes, Tiling, Flooring, Resilient Flooring, Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings, Specialty Casework, Laboratory Casework, Countertops, Laboratory Countertops, Institutional Furniture, Laboratory Furniture.
Division 21 - Fire Suppression, Fire-Suppression Sprinkler Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Plumbing Equipment, Drinking Fountains and Water Coolers, Gas and Vacuum Systems for Laboratory and Healthcare Facilities, Compressed-Air Systems for Laboratory and Healthcare Facilities, Vacuum Systems for Laboratory and Healthcare Facilities, Gas Systems for Laboratory and Healthcare Facilities, Chemical-Waste Systems for Laboratory and Healthcare Facilities, Processed Water Systems for Laboratory and Healthcare Facilities.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, HVAC Fans, Central HVAC Equipment.
Division 26 - Electrical, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents