Similar Projects
Savannah Harbor DMCA 1N Dike Raising
Design
$1,000,000 to $5,000,000 est. value
Port Wentworth, Savannah, GA

Ashley Avenue Drainage Project
Post-Bid
Less than $80,000 est. value
Marion, SC 29571

Calhoun Avenue Drainage Project
Post-Bid
Spartanburg, SC

Runway 20 Obstruction Removal
Results
Less than $196,000 est. value
Rock Hill, SC

Northgate/Cobb Road Storm Drainage Rehabilitation
Results
Greenwood, SC

FSR 3010 EROSION REPAIRS
Post-Bid
$25,000 to $100,000 est. value
Edgefield, SC

Animal Control Drain Line Repairs
Results
Newberry, SC

Woodcreek Pipe Relocation
Post-Bid
Conway, SC 29528

Benson Campus Under Road Drain Repair
Results
$15,000 to $17,000 est. value
Taylors, SC 29687

Charleston District USACE Industry Day for FY20 and FY21 Civil Works Diking Projects
Post-Bid
Charleston, SC 29403

Drainage Improvements Project at Bryson Elementary School
Results
Simpsonville, SC 29681

Washout Revetment Rebuild/Repair
Post-Bid
Folly Beach, SC 29439

Mathis Road Culvert Replacement
Results
Greenwood, SC

Trench Box-FA
Post-Bid
SC

Thornwood Drive Culvert Project
Results
Spartanburg, SC

Reported 12/11/2020 12:00 AM
Project Title

Huger Street and King Street Intersection Drainage Improvements Project

Physical Address View project details and contacts
City, State (County) Charleston, SC   (Berkeley County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The Work will include the replacement and installation of approximately 1,260 LF of storm drainage pipe varying from 15-in to 48-in diameter, installation of approximately 1,100 LF of replacement DIP water main varying from 6-in to 12-in in diameter with associated appurtenances, connections, and tie-in to existing water mains, installing approximately 30 drainage structures, asphalt replacement, asphalt mill and overlay, concrete curb and granite curb replacement, and approximately 420 SY of sidewalk replacement at and near the intersection of Huger St. and King St. The Work also includes traffic control, fence removal and reinstallation, vegetation and plant protection/temporary relocation, removal and replacement of drainage infrastructure, and relocation or replacement of other infrastructure.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 02 - Existing Conditions, Demolition.
Division 03 - Concrete, Precast Concrete.
Division 31 - Earthwork, Erosion and Sedimentation Controls, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings, Irrigation, Planting Irrigation, Planting, Planting Preparation, Soil Preparation, Landscape Grading.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Ponds and Reservoirs, Storm Drainage Structures.
Division 35 - Waterway and Marine Construction, Shoreline Protection.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents