Similar Projects
Last Updated | 05/14/2021 09:43 AM |
Project Title | Drainage and Roadway Improvements for Mudville Area |
Physical Address | View project details and contacts |
City, State (County) | Holliston, MA (Middlesex County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Paving/Reconstruction |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | $3,000,000 |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | In general, the Work of this Project consists of furnishing all labor, tools, materials and equipment to perform drainage system improvements; removal of existing curbing, berms and sidewalks; installation of new granite curbing; construction of new sidewalks; full depth reclamation of roadways; reconstruction of all roadways surfaces; restoration of all disturbed surfaces and related Work in Mudville Area neighborhood complete as shown on the Contract Drawings, as specified, and as evidently required to complete the Work. |
||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |