Similar Projects
4th Street Improvements
Post-Bid
$525,000 est. value
Chandler, TX

Water Well No. 7C Waterline
Results
$120,000 est. value
Chandler, TX 75758

Water Line Improvements
Post-Bid
Brownsboro, TX 75756

2019 Sewer Improvements
Post-Bid
Murchison, TX 75778

Larkin Water Main Modifications
Post-Bid
Athens, TX 75751

15 Inch Sewer Line Replacement
Results
$180,000 to $230,000 est. value
Malakoff, TX 75148

Redbud Circle Sewer Main Extension
Results
$29,430 est. value
Athens, TX 75751

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

Air Relief Valve Replacement
Results
$20,622 est. value
Athens, TX 75751

Water Improvements on Park, Prairieville, and E Clinton Streets
Results
Athens, TX 75751

Sewer Line Extension on Loop 7 and Highway 175
Results
Athens, TX 75751

Force-Main Bypass Connection
Results
$19,300 est. value
Athens, TX 75751

Automated Meter Reading System
Results
$400,000 est. value
TX 75156

Long Cove: Utility Expansion Project
Results
Malakoff, TX 75148

Long Cove: Utility Expansion Project
Results
Malakoff, TX 75148

Reported 11/18/2019 12:00 AM
Project Title

Carroll Street Utility Improvements

Physical Address View project details and contacts
City, State (County) Athens, TX 75751   (Henderson County)
Category(s) Sewer and Water
Sub-Category(s) Sanitary Sewers, Water Lines
Contracting Method Competitive Bids.
Project Status Request for Quotations
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The existing 10-inch, cast iron water main shall be removed and replaced with a new 12-inch, C900 PVC water main. The City will isolate the existing water main to allow the Contractor to remove and replace pipeline in the same location. No water services are believed to be connected to the existing main, and none are planned for the proposed water main. Contractor shall extend new water pipeline at the connection near E. Tyler at Carroll, then extend north to the connection near Larkin at Carroll to complete the installation. The attached sketch shows the general area and extents of the construction. An existing 10-inch, VCT sanitary sewer main shall be removed and replaced with a new 12-inch, SDR 26 PVC sewer main. The existing sewer is active and will require the Contractor to manage the flow during removal and replacement of pipeline and manholes. No sewer service laterals are believed to be connected to the existing main, and none are planned for the proposed sewer main. The Contractor shall replace the existing brick manholes, one near E. Tyler at Carroll and another near Larkin at Carroll, and construct two additional manholes along the route to intercept connecting pipelines. Manhole depths are approximately 9 feet. The City shall provide precast manhole bottom, barrel sections, cone, and access frame and cover for the project. Contractor shall be responsible for considering the impact of rain events and secure the job site in such a manner that prevents run off from a rain event from flowing into an active sewer.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents