Similar Projects
Last Updated | 08/20/2021 07:42 AM |
Project Title | Cameron Peak Emergency Response Culvert Replacement |
Physical Address | View project details and contacts |
City, State (County) | CO (Larimer County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Shoreline/Erosion/Drainage |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | Less than $1,000,000 |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Replacement of three culverts on SH 14 from MP 76 to MP 87. This will include: precast CBC, RCP, Grouted Boulder Basin, Erosion Control, Traffic Control, Asphalt Patching and Temporary Striping. 202-00010 Removal of Tree 20.000 EACH 202-00220 Removal of Asphalt Mat 606.000 SY 203-01597 Potholing 50.000 HOUR 206-00000 Structure Excavation 340.000 CY 208-00400 Water Control 1.000 L S 211-02278 Cement Grout (Formation) 22.000 CY 304-06007 Aggregate Base Course (Class 6) 156.000 CY 403-00720 Hot Mix Asphalt (Patching) (Asphalt) 120.000 TON 601-01000 Concrete Class B 9.200 CY 601-03025 Concrete Class D (Miscellaneous) (Colored) 14.900 CY 603-01485 48 Inch Reinforced Concrete Pipe (Complete In Place) 112.000 LF 603-71006 10x6 Foot Concrete Box Culvert (Precast) 48.000 LF 614-80001 Flashing Beacon (Solar Powered) 4.000 EACH 620-00001 Field Office (Class 1) 1.000 EACH 621-00450 Detour Pavement 380.000 SY 625-00000 Construction Surveying 1.000 L S 626-00000 Mobilization 1.000 L S 630-00000 Flagging 800.000 HOUR 630-00012 Traffic Control Management 45.000 DAY 630-80355 Portable Message Sign Panel 2.000 EACH 630-80370 Barrier (Temporary) 500.000 LF 630-86810 Traffic Signal (Temporary) 1.000 EACH |
||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |