Similar Projects
Reconstruction of Clearview Pumping Station
Renovation
Bidding
$21,492,605 to $29,078,230 est. value
Flushing, NY

Tier IV Pumping Station Improvement
Renovation
Bidding
Orangeburg, NY 10962

Wet Well Stair Replacement at Pump Stations 1E and 2E
Post-Bid
Rushville, NY

Bay Village Pump Station Replacement (REDI MO.64)
Post-Bid
Rochester, NY 14617

GC Phase 2 Water Supply, Contract 3: New Water Pump Stations
Term Contract
Results
Batavia, NY 14020

Belleayre Upper Mountain Snowmaking Pump Station - G, H, P, SP and E
Results
$3,370,000 to $3,855,000 est. value
Highmount, NY 12441

Bay Park Conveyance
Term Contract
Construction
Less than $439,000,000 est. value
NY

Sanitary Wastewater Pump Station Upgrades General Construction
Renovation
Construction
Saratoga Springs, NY

Amerige Park Pump Station Replacement
Renovation
Bidding
$300,000 est. value
Irondequoit, NY 14617

UV Upgrades at Rye Lake Pump Station-General Construction
Post-Bid
Mamaroneck, NY

Trunk Sewer Main and Pump Station Reconstruction
Results
Less than $4,700,000 est. value
Peru, NY 12972

I-481 and S.R. Industrial Sewer Corridor Project
New Construction
Construction
DeWitt, NY 13057

County Wide Water System Improvements Contract No - 2A - Chlorine System Improvements
Renovation, Infrastructure
Bidding
$400,000 est. value
Lakeville, NY

NCCWD - Water District Water Main Improvements, Water Storage Tank Improvements and Pump Station
Renovation
Post-Bid
Dunkirk, Sheridan, NY

Tuckahoe Road Chlorine Booster Station Upgrades
Results
Yonkers, NY 10701

Last Updated 04/25/2022 02:43 PM
Project Title

NMB Pump Station Improvements

Physical Address View project details and contacts
City, State (County) Lake Placid, NY 12946   (Essex County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $290,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

In a general overview the contract scope includes: All labor, tools, equipment, materials, temporary facilities and profit & overhead to construct suction line improvements and dam upgrades, including, but not limited to erosion and sediment control items, temporary dam, temporary stream bypass, cutoff wall and cap, suction line and gate, wet well, suction line, metal fabricated screens, low level bypass and valve, end dams, restoration and other ancillary and supplemental work to provide a complete project.

Details

Lift and Pump Stations, Renovation.
Division 02 - Existing Conditions.
Division 03 - Concrete.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 26 - Electrical.
Division 31 - Earthwork.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 35 - Waterway and Marine Construction.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents