Similar Projects
Broadway and Plaza Intersection and Signal Reconstruction Project
Infrastructure
Bidding
Castle Rock, CO

2021 Miscellaneous Concrete Replacement Project
Infrastructure
Post-Bid
Castle Rock, CO

2022 Town Facility Parking Lot Improvement Project
Infrastructure
Post-Bid
Castle Rock, CO

Canyons Filing 1 3rd Amendment Storm Roadways Water and Sanitary
Results
Lone Tree, CO

2021 Concrete Replacement
Results
Less than $432,109 est. value
Lone Tree, CO

2022 Curb, Gutter and Sidewalk Replacement Project
Infrastructure
Post-Bid
Castle Rock, CO

2021 Curb, Gutter and Sidewalk Replacement
Results
Less than $815,102 est. value
Castle Rock, CO

2022 Concrete Safety Improvement Project
Infrastructure
Post-Bid
Castle Rock, CO

2021 Town Facilities Parking Lot Improvement Project
Results
Less than $457,341 est. value
Castle Rock, CO

2021 Sidewalk Repair and Curb Ramp Retrofit Project
Results
Less than $3,209,905 est. value
CO

Elevated Pedestrian Walkways Repairs
Results
$150,000 to $250,000 est. value
Littleton, CO 80126

South Yosemite and County Line Road Signal and Curb Ramp Replacement
Results
Lone Tree, CO

Parker Road (SH83) Multi-Use Trail (West Side)
Infrastructure
Results
Parker, CO

Police Department Parking Lot Improvement Project
Infrastructure
Results
Castle Rock, CO 80104

Parker Downtown Circulation Improvements
Infrastructure
Results
Parker, CO

Last Updated 02/02/2022 06:09 PM
Project Title

2022 Concrete Replacement

Physical Address View project details and contacts
City, State (County) Lone Tree, CO   (Douglas County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $300,000 to $600,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The contract provides for the removal and replacement of approximately 10,150 sq feet of monolythically poured curb, gutter, and sidewalk; 6100 sq feet of sidewalk; 6550 LF of curb and gutter; 1780 sq feet of cross pans; and 6 ADA ramps.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents