Similar Projects
Seal Coat
Infrastructure
Sub-Bidding
$19,114,336 CJ est. value
Eden, TX 76837

FY 2023 Street Maintenance Program
Term Contract
Sub-Bidding
Bulverde, TX 78070

City Hall Exterior Wall Asbestos Abatement and Repairs
Alteration
Post-Bid
Irving, TX 75060

Asbestos Abatement Contractor
Alteration
Post-Bid
Bryan, TX

Dangerous Premises Abatement Lot Clearing and Securing of Structures
Results
$436,594 est. value
San Antonio, TX

Mold Remediation Consultant for the MB Envelope Repair and Restoration
Alteration
Results
$3,243 est. value
San Antonio, TX

Hickory Slough Sportsplex Detention Pond Phase 2 - DR2301 - City of Pearland
Infrastructure
Pending Verification
$3,140,000 CJ est. value
Pearland, TX 77584

3 Residential Structures - Demolition
Demolition, Infrastructure
Pending Verification
$18,700 CJ est. value
Temple, TX 76501

Facility Maintenance Repair Services District-Wide
Term Contract
Sub-Bidding
Brownsville, TX 78521

Environmental Services
Term Contract
Post-Bid
Less than $500,000 est. value
Washington, DC

Haz Mat Removal and Demolition of Golf Course Pro Shop
Infrastructure, Alteration
Results
$82,000 est. value
Burnet, TX 78611

Hillstead Subdivision Phase 1 Clearing and Grading Package
Infrastructure
Sub-Bidding
$1,000,000 CJ est. value
McKinney, TX 75070

Provide Homeless Encampment Cleanup and Abatement Services
Term Contract
Post-Bid
Houston, TX

FY 22 Asbestos Abatement Services for LSSLC
Alteration
Results
$80,000 est. value
Pollok, TX 75969

Site Development Culebra and Ranch View West
Infrastructure
Sub-Bidding
San Antonio, TX 78254

Last Updated 11/30/2022 10:34 PM
Project Title

Fort Bend County MUD No. 162 Wastewater Treatment Plant No. 2

Physical Address View project details and contacts
City, State (County) Richmond, TX 77469   (Fort Bend County)
Category(s) Single Trades
Sub-Category(s) Environmental
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected July 2022
Bids Due View project details and contacts
Estimated Value $5,654,135 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Construction of a 400,000 gallon per day bulls-eye wastewater treatment plant with onsite lift station. The deadline to ask questions is 5/23/2022 5:00 PM CST Project No.: 21-0011 Substantial Completion of the Work within 365 calendar days after the date of the written Notice to Proceed and Final Completion of the Work within 390 calendar days after the date of the written Notice to Proceed as determined by the Engineer. You shall proceed with construction in such a manner as to be Substantially Complete three hundred sixty-five (365) calendar days from the date of this Notice to Proceed, on SATURDAY, NOVEMBER 11, 2023, and achieve Final Completion, as determined by the Engineer, within three hundred ninety (390) calendar days from the date of this Notice to Proceed, which is FRIDAY, DECEMBER 8, 2023. These terms are in accordance with the fully executed contract documents, of which you have been provided a copy

Details

Division 01 - General Requirements, Special Procedures, Environmental Procedures.
Division 02 - Existing Conditions, Environmental Assessment, Hazardous Material Assessment, Site Remediation, Asbestos Remediation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents