Similar Projects
Fouke Arkansas School District Performing Arts Center
New Construction - 26,169 SF
Sub-Bidding
$6,000,000 to $8,000,000 est. value
Fouke, AR

Safe Room Construction
New Construction - 4,050 SF
Post-Bid
Jasper, AR 72641

Construction Managers and Architects - Various New Construction and Renovation Projects Districtwide
New Construction, Renovation
Post-Bid
Kirby, AR 71950

Summer Renovation Projects
Renovation
Results
Salem, AR

Construction Manager for School Facility
Results
Benton, AR

Maintenance Warehouse Project
New Construction
Post-Bid
Pearcy, AR 71964

MacArthur School Addition
Renovation, Addition
Results
Jonesboro, AR 72401

4 Portable Buildings
New Construction
Post-Bid
Dierks, AR

El Dorado High School Athletic Training Classroom Addition
Addition
Results
El Dorado, AR 71730

Construction Manager Services
New Construction
Post-Bid
Benton, AR

Washington Middle School Alterations
Renovation
Results
El Dorado, AR 71730

Palestine-Wheatley School District Baseball Concession/Restrooms
New Construction
Post-Bid
Palestine, AR

High School Football Stadium Renovations
Renovation
Results
$300,000 est. value
Magnolia, AR 71753

New Elementary School And New Arena
New Construction
Post-Bid
Warren, AR

Elementary Classroom Addition
Addition, Alteration - 8,000 SF
Post-Bid
Scranton, AR 72863

Reported 06/17/2022 12:00 AM
Project Title

Furnish and Installation of Contract (A) Single Story Preengineered Metal Building and Contract (B) Two Preengineered Metal Frames and Siding

Physical Address View project details and contacts
City, State (County) Cherry Valley, AR   (Cross County)
Category(s) Education
Sub-Category(s) Elementary School, Middle/Senior High School
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs), Construction Start Expected July 2022
Bids Due View project details and contacts
Estimated Value $500,000 [brand] Estimate
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Furnish and installation of Contract (A) a 729 sq. ft. single story pre -engineered metal building frame and siding with associated 700 sq. ft. of CMU insulated walls and Contract (B) two 50 sq. ft. pre - engineered metal frames and siding

Details

Elementary School, Renovation, Middle/Senior High School, 1 Story Above Grade, 729 SF Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents