Similar Projects
1400 East 1630 South to River Bottoms Road Sewer Lining
Term Contract, Infrastructure
Bidding
$180,000 est. value
Spanish Fork, UT 84660

2022 Santaquin Center Street Storm Drain Improvements Project
Infrastructure
Bidding
$400,000 est. value
Santaquin, UT 84655

River Bottom Improvement Project Prequalification
Post-Bid

Pressurized Irrigation Extension Project 2021
Post-Bid
Mapleton, UT

World-Wide Water Storage Tank Remediation
Term Contract
Results

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

North Shore Terminal Reservoir Phase 2 Expansion Project
Renovation
Construction
Orem, UT

2022 Eagle Mountain Replacement Collars
Alteration
Bidding
$60,000 est. value
Eagle Mountain, UT

Woodland Hills Waterline Replacement - Phase 2A
Infrastructure
Post-Bid
Woodland Hills, UT

FY 2019-20 Sewer Rehabilitation Project
Results
$200,000 to $250,000 est. value
Pleasant Grove, UT 84062

Santaquin Zone 11W Tank and Booster Pump CM/GC
New Construction
Post-Bid
Santaquin, UT 84655

Construction Services for Sand Pit and 600 East Culinary Water Tanks
Results
Less than $342,244 est. value
Lehi, UT 84043

Contractor Pre-Qualification Packet - Reuse Project
Infrastructure
Post-Bid
Orem, UT 84058

2020 Sewer Pipe Liners
Results
$1,400,000 to $1,600,000 est. value
Orem, UT

Vineyard 6 MG Tank and Booster Pump Station Project
New Construction, Infrastructure
Post-Bid
Vineyard, UT

Reported 05/13/2022 12:00 AM
Project Title

Goshen Town Culinary Water Improvements Project 2022

Physical Address View project details and contacts
City, State (County) Goshen, UT   (Utah County)
Category(s) Sewer and Water
Sub-Category(s) Sanitary Sewers, Storage/Water Tanks, Storm/Sewers, Water Lines
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected June 2022
Bids Due View project details and contacts
Estimated Value $1,910,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Site work and new construction of a civil project in Goshen, Utah. Completed plans call for the construction of a water / sewer project; and for site work for a water / sewer project. The Goshen Town Culinary Water Improvements Project 2022 includes constructing a new 500,000 gallon storage tank, replacing old system fire hydrants, replacing approximately 7,280 feet of old cast iron pipe, replacing an additional 14,050 feet of pipe to improve fire flow, and installing a new electronic SCADA system.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents