Similar Projects
Carter-Lee Park - Town of Smyrna
Infrastructure
Conception
$600,000 CJ est. value
Smyrna, TN 37167

Whataburger / Smyrna
New Construction, Infrastructure
Conception
$1,000,000 CJ est. value
Smyrna, TN 37167

Patterson Park Community Center Playground
Infrastructure
Design
$300,000 CJ est. value
Murfreesboro, TN 37130

Graystone - Section 1
New Construction, Infrastructure
Design
$30,000,000 CJ est. value
Murfreesboro, TN 37127

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Seal Coat & Striping
Infrastructure
Post-Bid
Murfreesboro, TN 37127

Resurfacing on U.S. 41 (S.R. 1)
Infrastructure
Results
TN

McFadden Basketball Court t- Phase 1: Site Work, Concrete Pad, and Basketball Goals Installation
Renovation, Alteration
Results
Murfreesboro, TN 37130

Overall Creek Shops
New Construction, Infrastructure - 14,000 SF
Construction
$3,700,000 CJ est. value
Murfreesboro, TN 37128

Overall Creek Shops
New Construction, Infrastructure - 14,000 SF
Construction
$3,700,000 CJ est. value
Murfreesboro, TN 37128

RFQ Design - Construct Sleep Disorder and Specialty Clinics Design - Murfreesboro
Addition, Demolition, Infrastructure, Renovation - 18,600 SF
Pending Verification
$20,000,000 CJ est. value
Murfreesboro, TN 37129

RFQ Design - Construct Sleep Disorder and Specialty Clinics Design - Murfreesboro
Addition, Demolition, Infrastructure, Renovation - 18,600 SF
Pending Verification
$20,000,000 CJ est. value
Murfreesboro, TN 37129

Taxiway F Development And T-Hangar Construction - City of Murfreesboro
New Construction, Infrastructure
Conception
$2,000,000 CJ est. value
Murfreesboro, TN 37129

Todd Lane Park - Town of Smyrna
Infrastructure
Design
$400,000 CJ est. value
Smyrna, TN 37167

Cheatham Stoplog Concrete Storage Slab
Term Contract, Infrastructure, Alteration
Post-Bid
$1,000,000 to $5,000,000 est. value

Last Updated 06/30/2023 09:36 AM
Project Title

Runway 1-19 Reconstruction and Runway Safety Area Improvements

Physical Address View project details and contacts
City, State (County) Smyrna, TN 37167   (Rutherford County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Paving/Reconstruction, Runways/Taxiways, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Results, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $12,479,901 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

As of June 30, 2023 the project has not been awarded yet. As of 1/30/2023 all bids rejected over-budget. TDOT Aeronautics Division (TAD) Project No. 75-555-0772-22 ATKINS Project No. 100077112 The project involves reconstruction of the majority of the airport's 5,546 feet by 100 feet secondary runway, Runway 1-19, excluding only the area within the safety area of the airport's intersecting primary runway, Runway 14-32. Also included is the regrading of the Runway 1-19 safety area measuring 7,746 feet by 400 feet. Reconstruction of the pavement will include removal of 25-foot shoulder pavement along each side of the runway and reconstruction of the runways existing flexible and composite pavement sections with a new cement-stabilized, reclaimed base and asphalt mix pavement surface. Pavement reconstruction will include nearly 2,000 tons of cement for stabilization of the base, and over 13,000 tons of asphalt mix pavement surface material. Safety area improvements will steepen the transverse slopes away from the runway pavement and placement of this material in the extended safety areas beyond each runway end, requiring approximately 70,000 cubic yards of excavation to on-site embankments, over 40,000 cubic yards of topsoil stripping and spreading, adjustments to, and addition of storm drainage inlet structures along the airport's storm drainage collection system, relocation of 900 feet of two-lane airport service road, 1,670 feet of 14-foot-wide airport perimeter road, and 1,600 feet of 8-foot-wide golf course cart path. Airfield lighting improvements include replacement of the runway's medium intensity runway edge lighting circuit with 49 edge lights and 16 threshold lights, two lighted supplemental wind cones, new runway end identifier lights at each runway end, and 23 lighted airfield signs. Along with re-routing portions of circuits for four other lighting circuits on the airfield, a total of approximately 24,500 linear feet of direct buried duct will be installed with bare copper counterpoise wire and approximately 38,000 linear feet of airfield lighting cable will be installed. Other miscellaneous project elements include 670 feet of relocated underground single-phase primary power line, over 1,500 linear feet of golf course irrigation system modifications, over 83,000 square feet of airfield pavement markings, over 1,600 linear feet of perimeter security fence, and extensive erosion prevention and sediment control measures over the 93-acre site, with over 24,000 square yards of sod placement, and 74 acres of other disturbed area to receive temporary and permanent turf stabilization. Each proposal must be accompanied by a Bidder's Bond on the form contained in the Proposal from a Surety Company acceptable to the Smyrna/Rutherford County Airport Authority or a Cashier's Check or Certified Check made payable to the Smyrna/Rutherford County Airport Authority for not less than 5 percent of the total amount of the bid. A 100% Contract Bond will be required. The Smyrna/Rutherford County Airport Authority reserves the right to reject any and/or all bids, to waive any informalities and technicalities in the bids received and to accept any bid which, in its opinion, may be in the best interest of the Authority. Prospective bidders should read the instructions for preparing bids in the Project Specifications carefully before submitting their bids and must supply all the information required therein within the time limits specified. Bids are required to remain open for acceptance or rejection for a period of sixty (60) days after the bid opening. The bidder must have at his disposal the necessary equipment to put on the project when notice is given to begin work and to do the work within a time specified. The proposal of any bidder will be rejected if the award of the work for which the proposal is submitted may, in the judgement of the Smyrna/Rutherford County Airport Authority, affect the workmanship, financing or progress of other work awarded to the bidder in the same letting or other work which the bidder may have under contract. Award of this contract is contingent upon the availability of funds. The complete examination and understanding of the Plans and Specifications and the proposed work site is necessary in order for the bidder to properly submit a proposal. Time limit for completion of the work is as shown on the proposal. Liquidated damages for delay of completion of contract will be in accordance with the General Provisions of the Specifications. The successful bidder shall hold and save harmless the Smyrna/Rutherford County Airport Authority from liability in connection with patents. All bidders must be licensed contractors as required by the Contractor's Licensing Act of 1976, T.C.A. 62-6- 101, et.seq. The Contractor will be required to comply with the wage and labor requirements and to pay minimum wages in accordance with the schedule of wage rates as required by T.C.A., Title 12, Chapter 4, as amended, and in accordance with federal prevailing wage laws. p.No-AC 150/5370-10H, 75-555-0737-17 A bidder that has doubt as to the true meaning of a project requirement may submit to the Owner's Engineer a written request for interpretation no later than seven days prior to bid opening Question Deadline 05/09/2023

Details

Division 31 - Earthwork, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Airfield Signaling and Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents