Similar Projects
Last Updated | 05/16/2023 12:07 PM |
Project Title | Delridge PF Turf Replacement & Accessibility Improvements |
Physical Address | View project details and contacts |
City, State (County) | Seattle, WA 98106 (King County) |
Category(s) | Single Trades |
Sub-Category(s) | Concrete |
Contracting Method | Competitive Bids |
Project Status | Bidding, Construction start expected July 2023 |
Bids Due | View project details and contacts |
Estimated Value | $3,050,000 [brand] Estimate |
Plans Available from | Municipal Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Replace outdated Synthetic Turf including remove all infilled turf field carpet and infill materials, install new pad system across the playing field surface, replace collector line along the West side with solid collector line and root, replace non-compliant concrete pathways with accessible concrete pathways, replace all dugout gates with accessible gates, replace access staircase with concrete staircase, replace existing drinking fountain with accessible drinking fountain, install new chain-link fence and swing gate. Additive #1: Improve the Delridge Community Center hardscape entrance and ramp to Delridge Way SW. Additive#2: Improvements at the Northwest corner of the playfield to provide improved access between Delridge Playfield and 26th Ave SW. Additive #3: Improve the ramp at the Southeast corner of the playfield and park lot improvements. Alternate #1: Install Pre-Formed Panelized System in place of Paved-in-Place Elastic Layer. Clarification Deadline : 5/10/2023 5:30 PM |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |