Similar Projects
Brookfield Streetscape Center Island Removal
Post-Bid
$20,000 est. value
Brookfield, CT

Island Circle Area Water Main Replacement and Road Reconstruction
Post-Bid
Groton Long Point, CT

Mansfield Road Phase 1 - Open to Previously Prequalified On-Call Trade Sitework Contractors
Results
$100,000 to $500,000 est. value
Mansfield, CT 06269

Columbus Avenue, Mazzotta Place and Berlin Street Water, Sanitary Sewer, Drainage and Roadway Improvements Public Works and Water and Sewer Departments
Results
$3,900,000 est. value
Middletown, CT 06457

Beach Street/First Avenue Road Improvements Phase 1
Post-Bid
West Haven, CT 06516

Patterson Park and Franklin Street Improvements
Results
Torrington, CT 06790

Campus Sidewalk and Roadway Improvements
Post-Bid
Willimantic, CT 06226

Reconstruction of North Bear Hill Road
Results
Chaplin, CT 06235

Cold Patch 2020-2021
Term Contract
Post-Bid
Waterbury, CT

Reconstruction of Pepper Street
Results
Monroe, CT 06468

Hot Patch 2020-2021
Term Contract
Post-Bid
Waterbury, CT

Pavement Rehabilitation of Newfield Road
Results
Torrington, CT

On-Call Equipment and Labor Rates for Civil Site Work
Post-Bid
Simsbury, CT

Riverside Road and Drake Hill Road Pavement Rehabilitation and Bridge Repairs at Bridge No. 05637
Results
Less than $481,138 est. value
Simsbury, CT 06070

Water Street Pavement Repair
Post-Bid
Bridgeport, CT 06610

Reported 10/09/2020 12:00 AM
Project Title

NER and Discovery Drive Intersection Improvements

Physical Address View project details and contacts
City, State (County) Mansfield, CT 06268   (Tolland County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Accepting Qualifications
Bids Due View project details and contacts
Estimated Value Greater than $337,500
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

1. Pedestrian Signal Improvements including signal heads and push button pedestals. 2. Dedicated left turn signal head for eastbound traffic on North Eagleville Road onto Discovery Drive 3. Associated wiring and signal programming of signal heads. 4. Dedicated left turn lane improvements for eastbound traffic on North Eagleville Road onto Discovery Drive 5. New poles, mast arms and traffic control appurtenances for the intersections of North Eagleville Road with Discovery Drive and Auditorium Road 6. Associated curb ramp and crosswalk improvements.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.
Division 34 - Transportation, Roadway Signaling and Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents