Similar Projects
Reconstruction of Lindberg Drive
Infrastructure
Bidding
$145,000 est. value
Warsaw, IN 46580

2022 CCMG Street and Stormwater Improvements
Infrastructure
Bidding
$3,000,000 est. value
Boonville, IN

Lindley Ditch Stormwater
Post-Bid
Huntington, IN

Graham Street Storm Sewer Replacement
Post-Bid
Franklin, IN 46131

Hessen Cassel Storm and Sidewalk Improvements
Results
Fort Wayne, IN 46800

Storm Water Improvements
Results
Coatesville, IN

2022-1 CCMG - Street Improvements and Stormwater Improvements
Infrastructure
Bidding
$2,000,000 est. value
Patriot, IN 47038

Helmsburg Stormwater Improvements
Post-Bid
Nashville, IN 47448

West Lafayette Campus - Bid package 7: Multiple Sanitary and Storm Sewer Repairs - 2021
Results
West Lafayette, IN

Claude Moody #583 Regulated Drain Reconstruction
Infrastructure
Bidding
$440,000 est. value
Crawfordsville, IN

2021 Street Improvements
Post-Bid
Fremont, IN 46737

Large Diameter Lining 2021- Sweetser
Results
Less than $2,850,000 est. value
Evansville, IN

CCMG Road Improvements
Post-Bid
Huntingburg, IN 47542

Wagner Tile (Upper) Regulated Stormwater Drain Reconstruction Sections 19
Results
Less than $180,600 est. value
Fort Wayne, Yoder, IN 46798

Storm Water Management System Improvements
Post-Bid
Valparaiso, IN 46383

Last Updated 06/13/2022 10:31 AM
Project Title

2021 Storm Water System Improvements Phase 1 - 4th, 6th and 9th Streets

Physical Address View project details and contacts
City, State (County) Clinton, IN   (Vermillion County)
Category(s) Sewer and Water
Sub-Category(s) Storm/Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Project includes the following work: In general, the project consists of 3 work areas. Area 1, 9th Street: Approximately, 1600 linear feet of swale regrading and restoration along with culvert improvements will take place near 9th and Wabash Streets drainage to existing storage basins. Area 2, 6th Street: A bio swale will be constructed near the intersection of 6th Street and Cherry Street to promote infiltration and evapotranspiration along with drainage collection improvements to handle stormwater runoff in this area. Area 3, 4th Street: A new drywell will be installed near the intersection of 4th Street and Higgins Street to replace the one that has failed there along with intersection safety enhancements to the area.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents