Similar Projects
Park Vista at El Tesoro Lift Station Facilities
New Construction
Bidding
Houston, TX 77083

HPW - Green River Drive and Chatwood Lift Station Diversion
New Construction, Infrastructure
Bidding
$14,730,650 est. value
Houston, TX 77078

Golden Acres WWTP Influent Lift Station
Post-Bid
Pasadena, TX 77506

Booster Pump Replacement Project
Post-Bid
Bellaire, TX

Wastewater Treatment Plant Number 2 Lift Station to Serve
Results
Less than $2,326,844 est. value
Houston, TX 77002

Booster Pump Replacement
Results

Lift Station No. 1, No. 2, and Forcemain Discharge Manholes
Infrastructure
Bidding
TX

Inspection, Maintenance, Repair and Related Items of Lift Station
Term Contract
Post-Bid
Less than $220,000 est. value
Houston, TX

Sanitary Sewer Lift Station Stuebner Hollow
Results
Houston, TX 77070

Reclaimed Water Pump Station
New Construction
Post-Bid
$1,070,000 est. value
TX

Repair Parts, Labor, and Related Items for Wastewater and Storm Water Lift Stations
Term Contract
Results
Houston, TX 77002

Lift Station No. 8 Force Main Replacement
Infrastructure
Post-Bid
$279,815 est. value
The Woodlands, TX

Balmoral Lift Station No. 1 Expansion
Results
Houston, TX

Grease Trap and Lift Station Services
Infrastructure
Post-Bid
Pasadena, TX

Sanitary Sewer Lift Station Braemar Village
Results
TX

Last Updated 11/08/2021 10:50 PM
Project Title

Lift Station No. 1 Rehabilitation

Physical Address View project details and contacts
City, State (County) TX   (Harris County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The rehabilitation of the existing lift station including but not limited to lift station wet well cleaning, abrasive blasting and recoating, abrasive blasting and recoating of above ground valves, piping, and bollards. Lift station wet well rehabilitation to include replacement of the stainless-steel pump lifting chains and OSHA approved safety nets. Lift station site rehabilitation also includes remove and replacement of three (3) plug valves, five (5) mechanical pipe supports, existing 10' entrance gate and fence repairs and the installation of 12' wide crushed concrete driveway. It shall be the contractor’s responsibility to develop a method to keep the flow lines active throughout construction. If you would like to visit the site, please contact the Operator.

Details

Lift and Pump Stations, Renovation.
Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents