Similar Projects
Potato Cut Project - Shasta County
Infrastructure
Conception
$1,000,000 est. value
Montgomery Creek, CA 96065

Anderson Park Concrete Repair - PW1718 - City of Carson
Infrastructure
Conception
$1,422,000 est. value
Anderson, CA 96007

Cape Seal Project (Measure N)
Term Contract
Design
Visalia, CA

Install Security Fencing for Whiskeytown Whiskeytown National Recreation Area
Alteration
Design
$500,000 est. value
Whiskeytown, CA

On-Call Cold Milling Services
Term Contract, Infrastructure
Bidding
Redding, CA

CHP Cottonwood Commercial Vehicle Enforcement Facility (CVEF) and Cottonwood Platform Scales- Parking Lot Sweeping Services.
Term Contract
Post-Bid
Cottonwood, CA 96022

Manila Highway 255 Shared Use Path
Alteration
Post-Bid
$888,055 est. value

HMA overlay, replace AC surfacing and shoulder backing
Infrastructure
Results
$1,570,000 est. value
CA

Asphalt Rubber Binder Seal Coat, Cold Plane AC Pavement and HMA
Infrastructure
Results
$1,810,000 est. value
CA

Construct Retaining Wall, Replace Concrete Sidewalk and HMA Paving
Infrastructure
Post-Bid
$2,640,000 est. value
CA

Construct HMA Structural Shoulder Sections and Modify Signal Systems
Infrastructure
Results
$880,000 est. value
CA

Construct Retaining Wall Replace Concrete Sidewalk and HMA Paving
Infrastructure
Post-Bid
$2,640,000 est. value
CA

Bell Avenue Complete Street Rehabilitation Project
Infrastructure
Results
$4,163,870 est. value

Pavement Replacement
Infrastructure
Post-Bid
$280,000 est. value

CA Flap Red 2017(3) Sacramento Island Trail
Term Contract
Results
$1,600,000 est. value
Redding, CA

Last Updated 07/22/2022 10:35 AM
Project Title

Bechelli Lane Improvements (ATP)

Physical Address View project details and contacts
City, State (County) Redding, CA 96002   (Shasta County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $9,463,617 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

**As of July 22, 2022, project was awarded to Tullis Inc., awarded amount is $9,463,617.46.** This project includes the construction of bicycle and pedestrian improvements along Bechelli Lane, between Cypress Avenue and South Bonnyview, and Loma Vista Drive, between Bechelli Lane and Churn Creek Road. The improvements include ADA compliant curb ramps, sidewalk gap completion, enhanced pedestrian crossings, buffered bike lanes, functional landscaping, corridor lighting, applying microsurfacing and restriping all as detailed on the plans and in these specifications. There are 225 working days. Each bid must be accompanied by cash, certified or cashier's check, or original bidder's bond made payable to the City of Redding for an amount equal to at least ten percent (10%) of the total amount of the bid as a guarantee that the contractor will execute the contract in conformance with his proposal and the specifications. The DBE contract goal is 20 percent. The City reserves the right to reject any and all proposals. The Engineer's Estimate is $8,649,000 MBE (6.8%), WBE (6.9%), DBE (20%)

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents