Similar Projects
Old Frederick Middle School Redevelopment
Renovation
Conception
$62,000,000 est. value
Winchester, VA 22601

Virginia Village Mixed-Use Redevelopment
New Construction, Renovation - 220,000 SF
Conception
$10,000,000 CJ est. value
Leesburg, VA 20175

One Hanover
New Construction, Build-Out, Demolition - 15,000 SF
Design
Fredericksburg, VA 22401

Solaire Tysons
New Construction, Build-Out - 8,000 SF
Design
McLean, VA

Renovations of Spratley House Apartments
Renovation - 45,989 SF
Post-Bid
Newport News, VA 23607

Golf Course Overlook
New Construction - 109,783 SF
Post-Bid
$500,000 to $1,000,000 CJ est. value
Reston, VA 20190

Holbert Building Elevator Number Two Modernization
Renovation
Results
Spotsylvania Courthouse, VA 22553

The Mather
New Construction - 686,435 SF
Construction
$500,000,000 est. value
McLean, VA 22102

King Street Station
New Construction, Demolition - 7,100 SF
Construction
Leesburg, VA

Potomac Yard Landbay C-East
New Construction - 519,001 SF
Pending Verification
Arlington, VA

Autumn Willow - Senior Housing
New Construction - 159,000 SF
Pending Verification
$10,000,000 CJ est. value
Fairfax, VA 22030

North Henry Street Apartments
New Construction
Conception
Alexandria, VA

Ames Center Redevelopment
New Construction, Build-Out - 793,946 SF
Design
Arlington, VA 22209

Summit Apartments - Building 6
New Construction - 8,620 SF
Post-Bid
Roanoke, VA 24014

The Lofts at Frederick Street
New Construction, Renovation, Demolition - 4,400 SF
Construction
$10,000,000 est. value
Fredericksburg, VA 22401

Reported 06/17/2022 11:48 AM
Project Title

Epoch / Harrisonburg

Physical Address View project details and contacts
City, State (County) Harrisonburg, VA 22801   (Harrisonburg City County)
Category(s) Residential
Sub-Category(s) Apartments/Condominiums
Contracting Method Competitive Bids.
Project Status Schematic Drawings, Construction Start Expected July 2023
Bids Due View project details and contacts
Estimated Value $42,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Work will a mixture of cottages, townhomes and apartment buildings with parking. As of October 21, 2021, this project is pending site plan approvals. A firm construction schedule has not been determined.

Details

Apartments/Condominiums, New Construction, 265.
Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents