Similar Projects
Steffens Court Interceptor Sewer/Road Construction, Contract B-21
Alteration
Bidding
Bellevue, WI

Road Work
Infrastructure
Bidding
New Franken, WI

Temporary Bypass Road Contract
Post-Bid
Less than $126,000 est. value
Hobart, WI 54155

Airfield Paving Construction MATOC
Post-Bid
Less than $400,000,000 est. value

Road and General Construction Multiple Award IDIQ for the Chequamegon-Nicolet NF
Results
$5,000 to $7,000,000 est. value

Road and General Construction Multiple Award IDIQ for the Chequamegon-Nicolet NF
Results
$5,000 to $7,000,000 est. value

2021 Cross Road Improvements
Infrastructure
Bidding
Sobieski, WI

Crackfilling
Post-Bid
De Pere, WI

Manitowoc - Green Bay, SCl - NCl
Results
Green Bay, Manitowoc, WI 54220

Green Isle Park Paving
Post-Bid
$300,000 est. value
Allouez, WI 54301

2021 Street and Utility Improvements Bohemia Drive, Hager Road, and Schleis Lane
Results
Denmark, WI 54208

HMA Paving
Post-Bid
Howard, WI

2021 Resurfacing
Results
Green Bay, WI

2021 Road Construction
Post-Bid
De Pere, WI

V. Bellevue, Manitowoc Road, Allouez Avenue - Kewaunee Road
Results
WI

Last Updated 05/15/2021 01:43 AM
Project Title

Pulaski - STH 22, Pulaski NVL - CTH E; Pulaski - STH 22, CTH E - STH 22

Physical Address View project details and contacts
City, State (County) Pulaski, WI (Brown, Oconto Counties)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Excavation Common, 922 CY; Base Aggregate Dense, 1,510 Ton; Marking Epoxy, 181,651 LF; Construction Staking, 75,136 LF; Construction Staking, 9 Each; Construction Staking, 2 LS; Culvert Pipe, 228 LF 24”, 218 LF 30“, 62 LF 36“, 16 LF 27”; Concrete Curb, 17 LF; Concrete Curb and Gutter, 151 LF; Beam Guard Energy Absorbing Terminals, 6 Each; Asphaltic Surface, 120 Ton; HMA Pavement, 71,463 Ton; Removing Asphaltic Surface Milling, 261,629 SY; Tack Coat, 41,111 Gals; Base Repair for Cold-In-Place Recycling Layer, 1,000 CY; Cold-In-Place Recycling Asphaltic Base Layer, 283,485 CY; Asphalt Stabilizing Agent, 1,422 Ton; Adjusting Steel Plate Beam Guard, 1,242 LF; Foundation Backfill, 477 CY; Polyester Polymer Concrete Overlay, 378 SY.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents