Similar Projects
FY22 USACE LRD Regional Construction Management Services Multiple Award Task Order Contract (MATOC)
New Construction, Renovation, Term Contract
Bidding
$200,000,000 to $300,000,000 est. value
Chicago, IL

FY22 USACE LRD Regional Construction Management Services Multiple Award Task Order Contract (MATOC)
New Construction, Renovation, Term Contract
Bidding
$200,000,000 to $300,000,000 est. value
Chicago, IL

Soldier Performance Readiness Center (SPRC), Multiple Locations Nationwide
- 41,700 SF
Post-Bid

Soldier Performance Readiness Center (SPRC), Multiple Locations Nationwide
- 41,700 SF
Post-Bid

Fort Custer - Construct Barracks #2564
New Construction
Results
Augusta, MI

Grand Ledge Armory - Armory Modifications
Renovation
Results
Grand Ledge, MI 48837

Negaunee Township - Bathroom Renovation
Renovation
Post-Bid
Negaunee, MI

Grayling Army Airfield Construct Barracks Building 1144
New Construction
Results
Grayling, MI 49738

Last Updated 09/16/2021 03:12 PM
Project Title

Modifications to Building 3000 (RTSM) Fort Custer Training Site

Physical Address View project details and contacts
City, State (County) Springfield, MI 49037   (Calhoun County)
Category(s) Government/Public
Sub-Category(s) Military Facility
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work under this contract includes, but is not necessarily limited to providing all labor, equipment, and materials to; modifications to Bldg. 3000 RTSM and all related work, at the Fort Custer Training Center

Details

Military Facility, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents