Similar Projects
Last Updated | 10/13/2020 08:43 AM |
Project Title | Mast Arm Update Projects |
Physical Address | View project details and contacts |
City, State (County) | Sarasota, FL 34234 (Sarasota County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Traffic Signalization |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The scope of work for both Projects A and B include replacing the existing span-wire traffic signals with one double-arm mast arm structure and two 12-foot signal pedestals; upgrading underground conduit/pull box infrastructure; upgrading signal electric power; upgrading intersection lighting leveraging LED fixtures mounted on top of existing and new light pedestals; upgrading pedestrian control features and crosswalks; upgrading ADA ramps in accordance with the ADA requirements; implementing new internally illuminated street name signs; installing replacement inductive loops; replacing a portion of the existing twisted pair copper cable (6-pair); and deploying a new CCTV camera. The existing control cabinet will be relocated on new concrete foundation in its current footprint. New traffic signal wiring will be implemented that separate low and high voltage conduit runs/pull boxes. Project Locations: Project A : Dr. MLK Jr Way and Old Bradenton Road (4337-290-R) Project B : Dr. MLK Jr Way and Cocoanut Avenue (4337-291-R) |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |