Similar Projects
APL Traffic Equipment
Term Contract
Post-Bid
Tallahassee, FL 32300

Traffic Monitoring Camera 2019A
Post-Bid
Port Saint Lucie, FL

Advanced Traffic Management System (ATMS), Implementation and Maintenance Services
Results
FL

Advanced Traffic Management System (ATMS)
Results
Tampa, FL 33601

Automated Traffic Signal Performance Measures (ATSPMs) Equipment
Term Contract
Results
Boca Raton, FL

Signalization Replacement at Intersection of US 1 and Lewis Point Road and St. Augustine South Drive
Results
Less than $454,770 est. value
Saint Augustine, FL 32086

Signalization Replacement at Intersection of US 1 / Shore Drive – HMGP 4283-012-R
Results
Less than $448,362 est. value
Saint Augustine, FL

Routine and Emergency Traffic Signal and Street Light Maintenance
Results
Palatka, FL 32177

Sumter County Repair and Maintenance of Traffic Signal Devices
Results
Less than $239,802 est. value
Wildwood, FL 34785

(MOT) Maintenance of Traffic Services Big Creek Project
Term Contract
Results
Clermont, FL 33585

Annual Traffic Loops Contract
Term Contract
Results
West Palm Beach, FL 33411

Traffic Signal and Roadway Lighting Services
Results
Less than $4,251,417 est. value
Tampa, FL 33601

Broadway Avenue /US 1 Mast Arm Installation Project
Results
Ormond Beach, FL 32175

Traffic Signal Information Technology Services (ITS)
Results
Less than $440,513 est. value
Tampa, FL 33601

Traffic Loop Detection Services
Results
Less than $464,859 est. value
Tampa, FL 33601

Last Updated 10/13/2020 08:43 AM
Project Title

Mast Arm Update Projects

Physical Address View project details and contacts
City, State (County) Sarasota, FL 34234   (Sarasota County)
Category(s) Heavy and Highway
Sub-Category(s) Traffic Signalization
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The scope of work for both Projects A and B include replacing the existing span-wire traffic signals with one double-arm mast arm structure and two 12-foot signal pedestals; upgrading underground conduit/pull box infrastructure; upgrading signal electric power; upgrading intersection lighting leveraging LED fixtures mounted on top of existing and new light pedestals; upgrading pedestrian control features and crosswalks; upgrading ADA ramps in accordance with the ADA requirements; implementing new internally illuminated street name signs; installing replacement inductive loops; replacing a portion of the existing twisted pair copper cable (6-pair); and deploying a new CCTV camera. The existing control cabinet will be relocated on new concrete foundation in its current footprint. New traffic signal wiring will be implemented that separate low and high voltage conduit runs/pull boxes. Project Locations: Project A : Dr. MLK Jr Way and Old Bradenton Road (4337-290-R) Project B : Dr. MLK Jr Way and Cocoanut Avenue (4337-291-R)

Details

Division 34 - Transportation, Transportation Signaling and Control Equipment, Roadway Signaling and Control Equipment, Traffic Signals, Traffic Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents