Similar Projects
Joe Pool Lake Slide Repair
Design
$1,000,000 to $5,000,000 est. value
Dallas, TX 75249

Attoyac Bayou Site 21 Remedial Repairs In Nacogdoches County, Texas
Term Contract
Design
$100,000 to $250,000 est. value

Cottonwood Branch Street Drainage and Pavement Improvement
Infrastructure
Bidding
$200,000 est. value
Frisco, TX 75034

Phase 5 - Grading Package for Bridgewater
Post-Bid
TX

Phase 7A/7B - Grading Package for Bridgewater
Infrastructure
Post-Bid
TX

Civil Works Design - Build Project the Courses at Watters Creek Erosion Control
Results
$304,894 est. value
Plano, TX 75025

Construction of Concrete Retaining Wall
Results
Less than $30,000 est. value
McKinney, TX

North Maxwell Creek Road Drainage Improvements Project
Infrastructure
Post-Bid
Murphy, TX 75094

Park Trail Drainage Improvements Phase 2
Results
Princeton, TX

Civil Works Design - Build Project Creek Bank Stabilization
Infrastructure
Post-Bid
$400,000 est. value
Allen, TX 75013

Cross Drain Structures Repair or Replacement
Results
Less than $204,491 est. value
TX

Creek Erosion Mitigation
Infrastructure
Post-Bid
$5,000,000 to $10,000,000 est. value
Plano, TX

Oxford Place, Phase 1 Earthwork Improvements
Results
McKinney, TX

Bois D'Arc Professional Park Detention Ponds
Renovation
Post-Bid
Princeton, TX

Erosion Control at Various Locations - Phase 3
Results
$4,694,826 est. value
Dallas, TX

Last Updated 05/12/2022 04:39 PM
Project Title

Indian Creek Tributary No. 13 and Shady Creek Circle Bank Stabilization

Physical Address View project details and contacts
City, State (County) Plano, TX 75024   (Collin County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,525,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Bids for a project which includes stream bank improvements for seven (7) sites along Indian Creek Tributary No. 13. The stream bank improvements include the installation of gab ion walls with concrete beams and rock anchors, gab ion mattresses, concrete trail with sidewalk wall, reinforced turf mat, and additional stream bank protection items. Rock Anchor Tiebacks shall consist of a high-strength steel continuous coil rod grouted in a pre-drilled hole into rock. Rock Anchors are used to stabilize and to anchor erosion control (gabion wall) structures to the rock mass.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents