Similar Projects
Calusa Country Club and Golf Course Redevelopment
New Construction
Conception
Kendall, FL 33186

West Port
New Construction - 200,000 SF
Conception
$10,000,000 CJ est. value
Port Charlotte, FL

Krome Grove Estates
New Construction - 7,950,000 SF
Design
Miami, FL

Caple South
New Construction - 14,875,000 SF
Design
$10,000,000 CJ est. value
Miami, FL

Community Development Block Grant- 1769 Grantham Drive
Renovation
Bidding
Wellington, FL 33414

Emergency Repairs and Facade Improvement, Residential Homes
Renovation
Bidding
Saint Petersburg, FL 33701

Avalon by the Beach
New Construction - 90,000 SF
Post-Bid
Hutchinson Island, FL 34949

Rehabilitation - 3714 Brophy Boulevard
Post-Bid
Cocoa, FL 32926

Public Private Partnership (P3) - Housing and Land Development Component
Results
FL

Housing Rehabilitation Program: 1110 Southport Court
Results
Less than $26,900 est. value
Wellington, FL 33414

Cypress Trail
New Construction - 115,000 SF
Construction
Ormond Beach, FL 32174

Springhill Phase 1B-2, 3, 4, 5
New Construction
Construction
Winter Garden, FL 34787

Moon Lake Acres
New Construction
Pending Verification
New Port Richey, FL 34736

Keene Road Housing Development
New Construction
Pending Verification
Dunedin, FL 34698

Reunion Village Phase 3
New Construction
Conception
Davenport, FL 33896

Reported 10/05/2021 12:00 AM
Project Title

Sumter County New Single Family Residence Construction for Blackford

Physical Address View project details and contacts
City, State (County) Webster, FL 33597   (Sumter County)
Category(s) Residential
Sub-Category(s) Single-Family Homes
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value Less than $350,000
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

New construction will be a (four) bedroom (two) bath concrete block 1352 sq. ft. single-family residence. The new house will be built beside the mobile home as identified on the site plan. Master bathroom: Install a roll-in shower with grab bars, raised toilet with grab bars, and standard sink with cabinet. Hall bathroom: Install a roll-in shower, standard toilet and sink with cabinet.

Details

Single-Family Homes, 1,352 SF New Construction.
Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents