Similar Projects
Fenstermaker Bridge Replacement
New Construction, Infrastructure
Bidding
Kutztown, PA 19530

Boyer Road, Snyder Road and Water Street Bridge Repair Project
Post-Bid
$150,000 est. value
Oley, PA 19547

Request for Quotation - Materials Wheeling & Lake Erie Railway
Renovation
Post-Bid

Mid Atlantic Construction IDIQ (MATOC)
Results
$50,000 to $2,000,000 est. value

Design, Fabricate and Deliver a Pedestrian Bridge
Results
Boyertown, PA 19512

Sources Sought/Request for Information for Pre-Fabricated Trail Bridges
Post-Bid

Miller's Eddy #1 Bridge and Miller's Eddy #2 Bridge Replace Project
Results
Shoemakersville, PA 19555

Parkview Road Pedestrian Bridge
Post-Bid
West Reading, PA 19611

Mill Creek Bridge-Hamburg
Results
$2,500,000 to $4,999,999 est. value
PA

Major Bridge P3
New Construction
Post-Bid

Rats Bridge Preservation 7
Results
$2,500,000 to $4,999,999 est. value
Reading, PA 19601

Monocacy Hill Road Bridge
Renovation, Infrastructure
Post-Bid
$175,000 est. value
Birdsboro, PA 19508

Bridge Repairs
Results

Water Street Bridge Repair Project
Infrastructure
Post-Bid
Oley, PA 19547

Palisades Drive Bridge Scour Repair Project
Results
Reading, PA 19605

Last Updated 10/06/2021 11:45 AM
Project Title

Emergency Bridge Repair - Equipment Rental, Material, and Labor

Physical Address View project details and contacts
City, State (County) Reading, PA   (Berks County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Furnish appropriate labor, material and equipment on the designated site within twenty-four (24) hours of telephone notification by the County of Berks Director of Facilities and Operations or his designated representative in cases of priority zero (0) bridge needs or other emergency. Other emergencies may be the result of an impact incident, flood event or inspection findings. Furnish appropriate labor and equipment within three (3) days for work not related to emergency call-out. Construction for priority zero (0) repair items are required to be completed by within seven (7) days of notification and within six (6) months for all other bridge needs.

Details

Bridge, Renovation.
Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents