Similar Projects
I-285 WB Ashford Dunwoody Road Ramp Extension
Bidding
GA

Public Work Services
Bidding
Brookhaven, GA

Peachtree Road Bridge Improvements and Malone Drive Sidewalk Project
Post-Bid
Chamblee, GA 30341

Blackburn Park Parking Lot Improvements
Post-Bid
Brookhaven, GA 30319

Briarwood Sidewalk Project
Results
$277,337 est. value
Brookhaven, GA

Trail Parking Lots
Results
Stone Mountain, GA 30087

Emmanuel Seventh Day Adventist Church Parking Lot Expansion
New Construction
Construction
Lithonia, GA 30058

Paving, Sealcoat and Restriping GPTC Parking Lots
Bidding
Clarkston, GA 30021

Pedestrian Safety And Bicycle Trail Improvements
Post-Bid
Decatur, GA

Briarwood Multiuse Path Project
Results
$137,143 est. value
Brookhaven, GA

Concrete Pads for Marta Shelters
Post-Bid
Stonecrest, GA

Construction of ADA Ramps and Bus Pads
Results
GA

Murphey Candler Park - North Boardwalk
Post-Bid
Atlanta, GA 30319

MT-02 Ashford Dunwoody/Montgomery Elementary Improvements
Results
$696,660 est. value
Brookhaven, GA

Vermack Road Shared Use Path From Womack to Vanderlyn
Post-Bid
Dunwoody, GA

Last Updated 05/06/2021 08:26 AM
Project Title

Dunwoody Parking Lot Repairs

Physical Address View project details and contacts
City, State (County) Dunwoody, GA 30338   (DeKalb County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value $380,000
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The scope of work for this project will include them milling and resurfacing of lots 11,10, & 2 on GSU Dunwoody Campus. In part of resurfacing, the contractor will be required to re-stripe the parking spaces based on the drawings produced by the design professional. There are some ponding issues in parking lot 11 that will need to be addressed. Improvement of the drainage system may require curb and gutter work with installation of inlets with pipe connections to existing stormwater conveyance systems. The scope of work includes milling the existing asphalt down to the specified elevation, repairing necessary foundation issues, re-surfacing with the necessary compaction, and re-striping of the parking spaces. Construction of this phase could overlap with on-going work on other parts of the campus. Coordination with the designer, construction manager and other trades and consultants already on-site will be required.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents