Similar Projects
Sterchi Farm Phase 2
Results
$247,550 est. value
Chattanooga, TN 37402

Selmer LPRF Patriot Park Improvements
Results
Selmer, TN

Fairview Baseball Field Concession Stand and Restroom
Renovation
Post-Bid
$40,000 to $50,000 est. value
Columbia, TN 38401

Malco Towne Mini Golf
New Construction - 27,600 SF
Conception
$1,000,000 to $5,000,000 CJ est. value
Collierville, TN 38017

Aaittafama Archaeological Park
Post-Bid
Nashville, TN

Restroom Pavilion and Accessible Trail
New Construction
Post-Bid
White Bluff, TN 37187

Lonas Young RV Park
Renovation
Post-Bid
LaFollette, TN 37766

Freedom Ball Fields
Bidding
$3,000,000 to $6,000,000 est. value
Franklin, TN

Lakeland Athletic Complex and Recreation Park
New Construction
Bidding
Lakeland, TN 38002

Last Updated 05/05/2021 02:43 PM
Project Title

Gazebos

Physical Address View project details and contacts
City, State (County) Spencer, TN   (Van Buren County)
Category(s) Entertainment/Recreation
Sub-Category(s) Misc. Recreational
Contracting Method Competitive Bids.
Project Status No Responses Submitted
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The construction should be completed with the following minimum construction specs. 1. Roofing should be of black shingles or similar material. 2. All material should be pressure treated. 3. 6x6 post for structure 4. Straight railings with scalloped braces. 5. Wooden flooring with light stain 6. Delivery and/or setup must be included. 7. Timeline for Completion and invoicing will be 06/15/2021. A total of 5 gazebos will be constructed

Details

Misc. Recreational, New Construction.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents