Project Title | Granular Activated Carbon (GAC) Enclosure and Miscellaneous Improvements at Plant 7 Contract No. 1 - General Construction |
Physical Address | View project details and contacts |
City, State (County) | Plainview, NY 11803 (Nassau County) |
Category(s) | Sewer and Water |
Sub-Category(s) | Sewage Treatment Plant |
Contracting Method | Competitive Bids |
Project Status | Results, Construction start expected May 2022 |
Bids Due | View project details and contacts |
Estimated Value | $1,955,407 [brand] Estimate |
Plans Available from | Copy Center |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | To download files, you must be a registered user and be logged-in. If you do not already have an account, you must register for an account under the 'Login' tab on the left-hand side of this page. An email confirmation containing your user name and password will be sent to you once your account has been created. Any bidder requiring printed documents to be shipped shall make arrangements with the printer and pay for all packaging and shipping costs. The project consists ofthree separate contracts for compliance with Wicks Law and generally consists of a new enclosure to be built around existing Granular Activated Carbon (GAC) vessels and existing concrete pad. Alternate bid items and contract documents are included for either a masonry building or a pre-engineered metal building, final selection to be made by Owner following review of bids and material delivery estimates. The work also includes replacement of well pumps and motors, a new chemical transfer containment pad, relocation and reconnection of existing generator load bank, power, controls, SCADA, all wiring and devices, site restoration, and other utility work as shown, and called for in conformance with the Contract Documents. These contracts will be partially funded through a New York State Environmental Facilities Corporation (NYS EFC) grant. All bidders will be required to meet all requirements for the grant, as detailed in the NYS EFC Terms and Conditions packeted included as part of the Contract documents, which includes measures for Minority and Women-Owned Business Enterprise (MWBE) and Service-Disabled Veteran Owned Business (SDVOB) participation. Bid Result. Contract 1 GC ALT A TOTAL:Philip Ross Industries $1,070,000.00 Contract 1 GC ALT B TOTAL:East End Group $885,407.00 |
||||||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |