Similar Projects
Esports Arena and Mixed Use
New Construction, Infrastructure - 6,000 SF
Design
$100,000,000 est. value
Town and Country, MO 63017

Caleres Inc Maryland Avenue Headquarters Development / Clayton
New Construction, Infrastructure
Design
$500,000,000 CJ est. value
Clayton, MO 63105

Longford Drive 1851 Storm Sewer
Infrastructure
Bidding
$70,000 CJ est. value
Saint Louis, MO 63136

Harlem Cityshed Mitigation Basins (Ashland and Essex)
Infrastructure
Bidding
$6,121,000 CJ est. value
Saint Louis, MO 63103

Westport Apartments
New Construction, Infrastructure - 251,748 SF
Sub-Bidding
$75,000,000 CJ est. value
Maryland Heights, MO 63043

2022 Hazelwood Tree Removal Project
Term Contract
Sub-Bidding
Hazelwood, MO 63042

Improving Mueller Road
Infrastructure
Post-Bid
Green Park, MO 63123

Lighting, Fencing And Security Surveillance System(S
Alteration
Post-Bid

Repave Streetscape at Justice Center
Results
Ballwin, MO 63011

FY22-FY26 On-Call Paving
Term Contract
Results
Olivette, MO

West Adams Avenue Condominiums / Kirkwood
New Construction, Infrastructure - 8,817 SF
Pending Verification
$2,000,000 CJ est. value
Kirkwood, MO 63122

South County Dodge Chrysler Jeep Ram Carwash
New Construction, Infrastructure
Pending Verification
$1,200,000 CJ est. value
Saint Louis, MO 63125

New Jennings Apartment Building
New Construction, Infrastructure
Design
$4,000,000 CJ est. value
Jennings, MO 63136

Kehrs Mill Road Retaining Wall Replacement Project
Infrastructure
Bidding
$100,000 CJ est. value
Chesterfield, MO 63017

Rock Salt - Supplemental Supply
Term Contract
Sub-Bidding
Saint Louis, MO 63122

Last Updated 08/08/2022 09:03 AM
Project Title

Interchange Improvement

Physical Address View project details and contacts
City, State (County) Saint Louis, MO 63136   (Saint Louis County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Bids by Invitation, Competitive Bids
Project Status Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $35,443,246 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

(1): Job J6I3020C Route I-270 ST LOUIS, ST LOUIS CITY County. Interchange improvement at Riverview Drive, the total length of improvement being 0.805 miles. Range: $20M to $25M Each Bid Shall Be Accompanied by a Certified Check or Cashier's Check, Drawn on Any Bank or Trust Company and Payable to "Director of Revenue, Credit State Road Fund", or Bidders May Submit a Bid Bond for Each Project Bid or an Annual Bid Bond That Would Cover All Projects Bid for a Twelve Month Beginning July 1 and Ending June 30 of Each Missouri State Fiscal Year. Annual Bid Bond Forms Must Be Submitted by June 15 of Each Year. Bid bonds must be Submitted on a form furnished by the commission, executed by the bidder and corporate surety, and naming the "State of missouri, acting by and Through the missouri highways and transportation commission", as obligee) for an amount (or penal sum) equal to 5% or more of the bid, Which check or bond shall be deposited with the commission as a guaranty and forfeited in the event the bidder is found to be the successful bidder and fails to comply with the terms of the request for bid. The Missouri Highways and Transportation Commission Hereby Notifies All Bidders That It Will Affirmatively Insure That in Any Contract Entered Into Pursuant to This Advertisement, Disadvantaged Business Enterprises Will Be Afforded Full Opportunity to Submit Bids in Response to This Invitation and Will Not Be Discriminated Against on the Grounds of Race, Color, Religion, Creed, Sex, Age, Ancestry, or National Origin in Consideration for an Award. The Right Is Reserved by the Missouri Highways and Transportation Commission to Reject Any or All Bids. Any Contractor Who Desires to Bid on the Project(S) Involved in the Bid Opening Must Have a Contractor Questionnaire on File in the Office of the Missouri Highways and Transportation Commission at Least Seven Full Days (168 Hours) Prior to the Time of Bid Opening. A New Contractor Questionnaire Must Be Filed Annually Except That the Commission May Request a New Questionnaire at Any Time. MODOT - F01 - Interchange Improvement *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents