Similar Projects
N045--Upgrade HVAC Phase V
Term Contract
Design
$5,000,000 to $10,000,000 est. value
Asheville, NC 28805

Air Handling Unit UV Light Installations
Alteration
Bidding
Salisbury, NC 27292

Replacement of Three HVAC Units
Alteration
Bidding
Brevard, NC

Request for Proposal for HVAC and Electrical Design and Consulting Services Andrew Carnegie Library
Post-Bid
Salisbury, NC 28144

Lighting and HVAC Updates for DLA
Post-Bid
$1,000,000 to $5,000,000 est. value
Cherry Point, NC

Legacy and Jones Residence Halls Make-up Air
Results
Less than $1,655,170 est. value
Greenville, NC

EMD Facility HVAC Upgrades
Results
Wilmington, NC

Southeast Middle School Gym HVAC Renovations
Alteration
Bidding
Salisbury, NC 28146

CTC Computer Room Air Conditioner
Term Contract
Post-Bid
Archdale, NC 27263

Cooler and Freezer Restoration at Durham County Detention Center
Term Contract
Results
Durham, NC 27701

Kernersville Middle School Gym HVAC Renovations
Alteration
Bidding
Kernersville, NC 27284

HVAC - Global Plasma Solution Installation Services
Post-Bid
Carthage, NC 28327

Courthouse Cooling Tower Replacement
Results
Beaufort, NC 28516

Williston Middle School Cafeteria HVAC Replacement
Alteration
Bidding
Wilmington, NC 28401

Police Headquarters HVAC Replacement
Post-Bid
Raleigh, NC

Reported 03/24/2022 12:00 AM
Project Title

Heating Venting and Air Conditioning Subcontracting Services for the Macon County Housing Department

Physical Address View project details and contacts
City, State (County) Franklin, NC 28734   (Macon County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Evaluate, clean and tune (ECT) heating/cooling equipment per ANSI/ACCA Standard 4 (Maintenance of Residential HVAC Systems) and North Carolina Weatherization Assistance Program Guidelines, providing full documentation of tests performed, conditions observed and recommended actions. a. Evaluation should include a visual inspection of existing ductwork, and, if applicable, notifying the Contractor of any deficiencies noted. b. Evaluation should include combustion and safety testing, if applicable. c. Conduct minor repairs to the heating/cooling system as determined by the ECT. For the purposes of this agreement, minor repairs are defined those repairs that and may be performed by Subcontractor performing the ECT service at the time of the initial service at no additional cost. d. Specify any additional work needed by electrician and/or plumber to achieve efficient, safe and code compliant operation of the unit. Any electrical and/or plumbing services must be separately contracted with by the Contractor; if the Subcontractor has a preference for a specific electrical or plumbing service provider, he/she may submit that request to the Contractor.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents