Similar Projects
Westshore Plaza Master Planned Development
New Construction - 3,469,000 SF
Conception
$10,000,000 CJ est. value
Tampa, FL 33609

Rithm at Uptown
New Construction, Demolition
Conception
Tampa, FL 33612

Renaissance Center VII
Build-Out - 118,808 SF
Design
Tampa, FL 33634

Tampa General Hospital Rehab Campus
New Construction - 798,000 SF
Design
$10,000,000 CJ est. value
Tampa, FL 33606

Causeway Commons
New Construction - 615,496 SF
Bidding by Invitation
$10,000,000 CJ est. value
Tampa, FL 33608

Charles Schwab - Tampa Oaks
Renovation - 11,923 SF
Post-Bid
Temple Terrace, FL 33637

Pae Professional Services
Renovation - 1,649 SF
Post-Bid
Tampa, FL 33618

Hangar 4000/E Rehabilitation
New Construction - 14,200 SF
Results
Tampa, FL 33606

Renovation Services THEA Transportation Management Center
Renovation - 27,727 SF
Results
Tampa, FL 33602

Office & Warehouse
New Construction - 14,000 SF
Construction
$1,000,000 to $5,000,000 CJ est. value
Tampa, FL 33613

Self-Storage at Fishhawk
New Construction - 111,000 SF
Construction
$10,000,000 CJ est. value
Lithia, FL 33547

Heritage Insurance
Build-Out - 88,643 SF
Pending Verification
Tampa, FL 33607

Boutique Office Building
New Construction - 9,148 SF
Pending Verification
$1,000,000 to $5,000,000 CJ est. value
Tampa, FL 33606

Tampa City Center Office Building
Renovation
Conception
Tampa, FL 33602

Renaissance Center VIII
New Construction - 220,000 SF
Design
$10,000,000 CJ est. value
Tampa, FL 33634

Reported 08/03/2020 12:52 PM
Project Title

Dawning Family Services Headquarters Public Facility improvements RFP 1 - Building A

Physical Address View project details and contacts
City, State (County) Tampa, FL 33604   (Hillsborough County)
Category(s) Commercial
Sub-Category(s) Office
Contracting Method
Project Status Construction Commenced July 2020, No Sub Bids Needed
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The proposed Hillsborough County scope items for the Project are as follows:Design and Engineering Permitting Environmental Minor Repairs to Building B Partial Site and Infrastructure {addendum forthcoming} Construction of Building A Bond and Construction Management fees Contingency at 10% Dawning Family Services RFP includes a description of the scope items to be provided by respondents. These services include, but are not limited to, the following: demolition, remodeling, wood framing, lead paint & asbestos abatement, and a later addendum to include stormwater management sitework, utilities sitework, paving, striping, sidewalks, fencing, landscaping, and site lighting. All potential bidders and respondents to the RFP must be able to meet the following criteria: Provide Builders Risk Insurance equal to the Hillsborough County, FL. CDBG budget. Provide Bonds as required equal to the Hillsborough County, FL., CDBG total project budget. Meet all Davis Bacon and Related Acts requirements. Compile U.S. Department of Labor documentation for all General Contractor, Subcontractors, Materialmen, Suppliers, etc. employees to meet all Davis Bacon and Related Acts requirements Copies of the detailed Request for Proposals (RFP) can be obtained by written request to info@coastalcitysolutions.com; only email requests will be responded to. The RFPs will be released beginning 16-March-2020 and all bidders will be allowed 30 days to compile their pricing. All sealed bids must then be delivered in person no later than 2pm on 13-April-2020. Project

Details

Office, 2 Stories Above Grade, 3,668 SF Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.
Division 33 - Utilities, Storm Utility Drainage Piping, Public Storm Utility Drainage Piping.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents