Similar Projects
WAPA (DSW Region) General Site Work/Concrete Construction MATOC
Post-Bid

Construct Fsr 4 Road Project - Tonto National Forest
Infrastructure
Post-Bid
$100,000 to $250,000 est. value
Rio Verde, AZ 85263

Terminal Access Road Reconstruction and Drainage Improvements
Results
$1,500,000 to $200,000 est. value
Bullhead City, AZ 86429

System Enhancement (Safety Improvements)
Results
Bullhead City, AZ 86429

Horsethief Basin Roads Maintenance - Prescott National Forest
Term Contract
Post-Bid
Prescott, AZ 86301

Safety Improvements
Results
Less than $640,000 est. value
Kingman, AZ 86411

System Preservation (Restoration/Rehab/Resurface)
Results
Less than $9,500,000 est. value
Kingman, AZ 86401

Hot and Cold Mix
Term Contract
Results
Kingman, AZ 86401

FY 2020-2021 Crack Seal Program
Results
Less than $300,000 est. value
Lake Havasu City, AZ

FY 20-21 CQS Fog Seal Program
Results
Less than $550,000 est. value
Lake Havasu City, AZ 86403

Construct SB Right Turn Land on SR 95
Results
Bullhead City, AZ 86429

Fort Mohave Penetrate and Chip Seal
Results
$149,749 est. value
Kingman, AZ

Apache Road Improvements South Phase
Results
Kingman, AZ

Apache Road Improvements North Phase
Results
Kingman, AZ 86413

Brooks Boulevard Millings
Results
Kingman, AZ

Last Updated 10/11/2021 06:05 AM
Project Title

FY21-22 CQS Fog Seal Program

Physical Address View project details and contacts
City, State (County) Lake Havasu City, AZ 86403   (Mohave County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $340,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project consists of a Base Bid that includes approximately 363,064 square yards of CQS LM 50/50 with two (2) Parking Lots included in the Base Bid and two (2) Alternates. Alternate 1 consists of approximately 25,377 square yards of CQS LM 50/50. Alternate 2 consists of approximately 26,335 square yards of square yards of CQS LM 50/50. This project is expected to begin in the Fall of 2021, weather permitting. It shall be understood that Lake Havasu City is under no obligation to award this project.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents