Similar Projects
Lakeside At Trappe Master Plan
New Construction
Design
Trappe, MD

WRTP Launder Cover Design
Bidding
Chesapeake Beach, MD 20732

Stevensville Water Treatment Plant
New Construction
Bidding by Invitation
Stevensville, MD 21666

Water Treatment Program
Post-Bid
Princess Anne, MD 21853

Solids Screening at Four Water Resource Recovery Facilities Project
Post-Bid
Damascus, MD

Chesapeake Heights and Dares Beach Well and Water Main Extension - Phase 2
Results
Prince Frederick, MD 20678

Pump & Valve Replacement for Allegany County Soldiers Memorial USARC in Cumberland, MD 21502
Results
Cumberland, MD 21502

Alaris Medley Infusion Pumps
Post-Bid
Rockville, MD 20850

Fair Hill Water System Upgrade
Renovation
Results
Elkton, MD

Repair of Steam Sterilization Plant, Fort Detrick, MD
Post-Bid
$25,000,000 to $100,000,000 est. value
Fort Detrick, MD

Hickory Hills Water Tower and Well Project #8081WT and #8081WL
Results
$5,000,000 to $6,500,000 est. value
California, MD

Well Services
Term Contract
Post-Bid
Annapolis, MD 21401

Repairs and Services to Hydraulic Pumps and Motors
Results
Glen Burnie, MD 21061

By-Pass Pumping Services
Term Contract
Post-Bid
Laurel, MD 20707

Water Treatment Services
Term Contract
Results
$13,530 est. value
Kensington, MD 20895

Last Updated 03/31/2020 10:12 AM
Project Title

Fruitland Water System Upgrade - Supply Well and Water Treatment Plant

Physical Address View project details and contacts
City, State (County) Fruitland, MD 21826   (Wicomico County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells, Water Treatment Plant
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Well and WTP Upgrade generally consists of, but is not limited to, the construction/installation of the following: new 600 gpm 12-inched cased water supply well, 4th Greensand Pressure Filter System, mechanical modifications to existing three (3) pressure filter units, new 43,000 gallon Reclaim Tank and recycle system, updated electrical controls, chemical feed systems and all associated appurtenances.

Details

Division 02 - Existing Conditions, Subsurface Investigation, Geotechnical Investigations, Subsurface Drilling and Sampling.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Windows, Hardware, Glazing.
Division 09 - Finishes, Flooring, Painting and Coating.
Division 10 - Specialties, Signage, Safety Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings.
Division 13 - Special Construction.
Division 14 - Conveying Equipment, Lifts.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Air Terminal Units.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exterior Lighting.
Division 27 - Communications, Data Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wells, Wastewater Utility Pumping Stations, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 40 - Process Integration, Water Process Piping, Instrumentation and Control for Process Systems.
Division 41 - Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Conveying Equipment, Bulk Material Feeders, Conveyors, Cranes and Hoists.
Division 44 - Pollution and Waste Control Equipment, Odor Treatment Equipment, Water Pollution Control Equipment, Water Pollution Containment and Cleanup Equipment.
Division 46 - Water and Wastewater Equipment, Common Work Results for Water and Wastewater Equipment, Water and Wastewater Preliminary Treatment Equipment, Water and Wastewater Chemical Feed Equipment, Water and Wastewater Clarification and Mixing Equipment, Water and Wastewater Secondary Treatment Equipment, Water and Wastewater Advanced Treatment Equipment, Water and Wastewater Residuals Handling and Treatment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents