Similar Projects
Boiler Maintenance and Repair Hampton Roads Area
Term Contract
Design

Boiler Maintenance and Repair Hampton Roads Area
Term Contract
Design

Mechanical System Projects
Term Contract
Bidding
Stafford, VA

Portsmouth Civic Center Boiler Replacement
Alteration
Bidding
Portsmouth, VA

Water Treatment Chemicals and Service
Post-Bid
Newport News, VA

130 Ton Chiller - Re-solicit
Post-Bid
Richmond, VA

J--Boiler Plant Condensate Pump Repair
Results
Salem, VA 24153

LP Gas Fired Water Heater
Results
$26,372 est. value
Bedford, VA

Advanced Metering Infrastructure Service and Repair
Term Contract
Bidding
Yorktown, VA 23690

Polaris Water Heaters
Post-Bid
Portsmouth, VA

Mechanical Improvements Salem District Shop
Results
Salem, VA 24153

External Walk In Cooler Purchase and Install at MCTC
Post-Bid
Roanoke, VA

Mechanical /Plumbing/HVAC Services
Term Contract
Results
Alexandria, Annandale, Manassas, Springfield, Sterling, Woodbridge, VA

Carver Elementary School Walk in Freezer
Alteration
Post-Bid
Martinsville, VA 24112

Cooling Towers
Results
Richmond, VA

Last Updated 09/13/2021 04:57 PM
Project Title

Mechanical Services

Physical Address View project details and contacts
City, State (County) Carrollton, VA 23314   (Isle of Wight County)
Category(s) Single Trades
Sub-Category(s) Mechanical
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

•Provide plastic dust barriers. •Provide signs designating Construction Area. •Provide labor and material necessary to drain dual temperature system. •Remove acoustical ceilings as required. Replace all ceiling grid and ceiling acoustical tiles when finished with the piping system repairs. •Replace dual temperature piping, beginning one foot inside the mechanical mezzanine serving ten (10) console units and two (2) hall units. Hangers to be reused. •Replace branch piping from mains serving three (3) VAV boxes. •Replace valves in ten (10) classroom closets and valves on three (3) VAV boxes. Control valves to be replaced and tied into controls system. •Open wall in closet, replace piping, replace drywall finish after pipe testing and paint closet matching original paint (10 locations). Remove casework as needed to replace piping at consoles and reinstall in ten (10) locations. •Furnish and install 1-1/2” fiberglass pipe insulation on approximately 1,570 linear ft. of piping. •Provide labor and material necessary to refill piping system, bleed air, and test water flow and equipment operation. 24- Hour leak check. •Clean working areas daily. •Provide necessary permits. •Fire caulk of HVAC related penetrations as required by code. •Provide Asbestos testing & removal as needed Standard one-year parts, material, and labor warranty with proper treatment of water in system.

Details

Division 11 - Equipment, Operation and Maintenance of Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents