Similar Projects
Americare Senior Living / Jefferson City
New Construction, Infrastructure
Design
$5,506,601 CJ est. value
Jefferson City, MO 65101

Bridge Rehabilitation
Infrastructure
Bidding
$500,000 CJ est. value
Jefferson City, MO 65101

Cold Milling and Asphalt Paving Services
Infrastructure
Bidding
$700,000 CJ est. value
Jefferson City, MO 65109

Radio Tower Erection Service - PEN Site
Infrastructure, Alteration
Post-Bid
$400,000 est. value
Jefferson City, MO 65109

Missouri State Penitentiary Redevelopment - City of Jefferson City
New Construction, Infrastructure, Renovation
Post-Bid
$20,000,000 CJ est. value
Jefferson City, MO 65101

Concrete Repairs to Skate Park at Washington Park
Infrastructure
Results
$48,450 CJ est. value
Jefferson City, MO 65109

Irrigation, Debra Cooper Park at Adrian's Island
Infrastructure
Results
$56,612 CJ est. value
Jefferson City, MO 65101

Health Department Driveway Project
Infrastructure
Construction
$180,637 CJ est. value
Jefferson City, MO 65101

Pavement Repairs and Seal Coat Parking Lots
Infrastructure
Post-Bid
$300,000 CJ est. value
Jefferson City, MO 65101

Replace Ice Builders - Building 13
Demolition, New Construction, Infrastructure
Results
$1,624,000 CJ est. value
Jefferson City, MO 65101

New Metal Building
Demolition, New Construction, Infrastructure
Post-Bid
$200,000 CJ est. value
Russellville, MO 65074

63 Diamonds Sports Complex Improvements
Infrastructure - 2,248 SF
Results
$420,181 CJ est. value
Jefferson City, MO 65101

Lincoln University Softball Field Renovation
Infrastructure
Post-Bid
$1,826,000 CJ est. value
Jefferson City, MO 65101

Westview Forcemain Replacement
Infrastructure
Results
$325,918 CJ est. value
Jefferson City, MO 65101

Tidal Wave Auto Spa / Jefferson City
New Construction, Infrastructure - 3,451 SF
Post-Bid
$800,000 CJ est. value
Jefferson City, MO 65109

Last Updated 02/01/2023 04:03 PM
Project Title

Horn Branch Reclamation Project

Physical Address View project details and contacts
City, State (County) Jefferson City, MO 65101   (Cole County)
Category(s) Heavy and Highway
Sub-Category(s) Dam/Tunnel, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected February 2023
Bids Due View project details and contacts
Estimated Value $2,075,952 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

Scope: The project intends to complete coal mine reclamation activities including; Construct an Earthen Dam; backfill abandoned coal mine pits, grade, lime, seed, fertilize and mulch all work areas and other related work. The project work area to be reclaimed is made up of approximately 107 non-contiguous acres with three private landowners. There are 1,770 feet of dangerous highwalls, 23 acres of dangerous pile/embankments, and four polluted water bodies for agriculture PWAI. The dangerous highwall averages 25 feet in height and the dangerous pile/embankments averages 20 feet in height and covers an approximate area of 23 acres. These are considered Priority 2 AML features and are mostly near vertical to vertical. MBE/WBE/SDVE Goals: MBE 10%, WBE 10%, and SDVE 3%. NOTE: Only MBE/WBE firms certified by the State of Missouri Office of Equal Opportunity as of the date of bid opening, or SDVE(s) meeting the requirements of Section 34.074, RSMo and 1 CSR 30-5.010, can be used to satisfy the MBE/WBE/SDVE participation goals for this project. n addition to the State of Missouri MBE/WBE/SDVE participation goals set forth herein and in the bid documents for this project, the contractor on a federally funded/assisted construction project is subject to the federal Executive Order 11246. The Bidder's attention is drawn to the Notice of Requirement for Affirmative Action To Ensure Equal Opportunity (Executive Order 11246, 41 C.F.R. 60-4.2) in Section 00733, SUPPLEMENTARY GENERAL CONDITIONS FOR FEDERALLY FUNDED/ASSISTED CONSTRUCTION PROJECTS, which is incorporated by reference. The State reserves the right to reject any and all bids and to waive all informalities in bids. No bid may be withdrawn for a period of 20 working days subsequent to the specified bid opening time. The contractor shall pay not less than the prevailing hourly rate of wages for work of a similar character in the locality in which the work is performed, as determined by the Missouri Department of Labor and Industrial Relations and as set out in the detailed plans and specifications.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Subgrade Preparation, Excavation, Shoring, Tunneling and Mining, Tunnel Excavation.
Division 35 - Waterway and Marine Construction, Dam Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents