Similar Projects
NW 150th Avenue and NW 145th Avenue Road and NW 112th Place Road
Infrastructure
Bidding
$1,141,393 est. value
FL

Roosevelt Village Unit 1 - Road Improvement Project
Infrastructure
Bidding
$825,000 est. value
Ocala, FL

SNL Infrastructure Construction and Maintenance
Infrastructure
Post-Bid

Silicone Joint Sealer
Infrastructure
Post-Bid

Quiet Zone Improvement - South Ocala (SE 52nd ST, SE 62nd ST, SE 73rd ST, SE 80th ST at RR Crossings)
Results
Less than $502,304 est. value
FL

CR 315 Mill & Resurface (SR 40 to 90th Street Rd)
Results
Less than $1,317,327 est. value
FL

SW 83 Place Road /SW 189 Court Road (0.25 mi East of SW 196 Avenue Road to SW 190 Avenue Road)
Infrastructure
Bidding
$440,000 est. value
FL

East/South Highway 25 (CR 25) from S Highway 464 to SE 141st Avenue Road
Infrastructure
Post-Bid
$616,000 est. value
Ocala, FL

Marion Oaks Pass Resurfacing (Marion Oaks Manor to SW 143rd Street)
Results
Less than $440,000 est. value
Ocala, FL 34473

Mockingbird Drive and West Blue Cove Drive Roadway Project
Infrastructure
Bidding
Dunnellon, FL 34432

Evaluation of Enhanced-Friction Asphalt Overlays and Surface Treatments
Infrastructure
Post-Bid

NW 77 St Resurfacing (SR 326 to N US Hwy 441)
Results
FL

Cedar Hills Combined MSTU Road Improvement and MCU Lift Station and Force Main Project
Renovation, Infrastructure
Bidding
$1,090,708 est. value
Ocala, FL

District Five Ocala Operations Center Asphalt, Mill, Overlay, Parking Lot Striping
Infrastructure
Post-Bid

SW Ridgewood Rd Resurfacing (SW Woodland Ave to NW 27th St)
Results
Less than $734,124 est. value
FL

Last Updated 04/11/2022 09:06 AM
Project Title

Banyan Road Resurface (from SE 58th Avenue to Almond Road) and SE 4th Place/SE 61st Court (from SE 5th St to SE 3rd Place)

Physical Address View project details and contacts
City, State (County) FL   (Marion County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $261,420
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Banyan Road: The project is a resurfacing project for Banyan Road, from SE 58th Avenue to Almond Road. Generally, the work includes: 1.1 Overlaying the existing pavement 1.2 Constructing side street and driveway aprons 1.3 Extending cross drains and adding end treatments 1.4 Replacing/constructing sidewalk sections and detectable warning surfaces 1.5 Sodding shoulders 1.6 Restriping the pavement markings Se 4th PL/SE 61st CT: The project is a resurfacing project for SE 4th Place/SE 61st Court, from SE 5th Street to SE 3rd Place. Generally, the work includes: 1.7 Overlaying the existing pavement 1.8 Constructing side street and driveway aprons 1.9 Sodding shoulders 1.10 Restriping the pavement markings

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents