Similar Projects
NTP Vertical Turbine Pump Rebuild
Bidding
Brighton, CO 80603

Colorado City Artesian Well 4584-F
Bidding
Colorado City, CO

Water Right Due Diligence - Arkansas River Basin
Post-Bid
Denver, CO

Carmichael Park Vault
Post-Bid
Brighton, CO 80601

2019 Alluvial Well Improvements
Results
Less than $2,000,000 est. value
Commerce City, CO

Repair by Replacing Domestic Water Pumps B420
Results
$1,000,000 to $5,000,000 est. value
Colorado Springs, CO

Non-Potable Pond Pump Station
Construction
Brighton, CO 80601

MMAARS 6 Well Project
Bidding
Denver, CO

On Call Alluvial Well Maintenance & Repair
Post-Bid
Castle Rock, CO

Six Denver Basin Aquifer Wells Drilling Project
Results
Denver, CO

Directional Boring and Trenching
Bidding
Fort Collins, CO

2020 On Call Deep Well Repair
Post-Bid
Castle Rock, CO 80109

EC, Provide Sump Pump and Controls
Results
Loveland, CO 80537

2019-2020 Planned Rehabilitation & Well Abandonment Of Denver Basin Aquifer Well
Post-Bid
Castle Rock, CO 80109

2020 Well Maintenance Project
Results
Less than $279,000 est. value
Aurora, CO 80016

Reported 11/23/2019 12:00 AM
Project Title

South Suburban Littleton Golf Course Well # 1

Physical Address View project details and contacts
City, State (County) Littleton, CO   (Arapahoe County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The work to be performed generally includes drilling a 42-in diameter borehole; installing a 30-in diameter surface casing to 19 feet and cementing in place; drilling a 28-in diameter well bore to 48 feet; installing 28 feet of 20-in diameter casing; 15 feet of 20-inch diameter stainless steel well screen and a 4 ft long, 20-in diameter sump; installing 19 feet of gravel pack and 19 feet of cement; conducting up to 24 hours of surge and bail development and 8 hours of raw hiding; pump test the well for up to 32 hours at a range of 800 to 1200 gpm; conducting a well video; and abandoning the old well per State standards.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents