Similar Projects
Mcinnish Parking Lot Improvements - City Of Carrollton
Alteration
Conception
$750,000 est. value
Carrollton, TX 75006

Judge Charles R. Rose Community Park
New Construction, Infrastructure
Design
$3,000,000 est. value
Dallas, TX 75241

South Pocket Park/Royal Tech Commons
Infrastructure
Design
$469,000 est. value
Irving, TX 75063

TRN Signal Reconstruction - Walnut Hill and White Rock Trail
Post-Bid
$310,000 est. value
TX 75200

Streetscape and Sidewalk Repair
Post-Bid
TX 75200

Dallas Love Field Entry Road Enhancements
Results
$13,060,705 est. value
Dallas, TX

Traffic Signal Improvements
Results
Less than $2,115,690 est. value
TX

23 Springs Mixed-Use / Dallas
New Construction, Infrastructure - 669,591 SF
Construction
$169,000,000 est. value
Dallas, TX 75201

Parking Lot Repair
Infrastructure
Construction
Dallas, TX 75224

Traffic Signal Construction - New Clark Road at Wintergreen Road
Post-Bid
$300,000 est. value
Cedar Hill, TX 75106

2015 Regional Sidewalk Replacement Program - Region 5 and Region 4 Completion
Results
$1,370,000 est. value
Richardson, TX

Polyurethane Foam Injection- Concrete Leveling
Term Contract
Post-Bid
Irving, TX

Term Contract for Traffic Loops
Term Contract
Results
Garland, TX

Reclamation and Resurfacing of Parking Lots at Irwin Park and Guy Berry Park
Infrastructure
Post-Bid
Balch Springs, TX 75180

Construct Frtg Roads, Modify Ramps, Bayside Bridge
New Construction
Results
$141,865,358 est. value
TX

Reported 07/01/2022 12:00 AM
Project Title

Traffic Signal and ADA Improvements

Physical Address View project details and contacts
City, State (County) Addison, TX   (Dallas County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot, Traffic Signalization
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected August 2022
Bids Due View project details and contacts
Estimated Value $1,400,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists of constructing traffic signal and ADA improvements at the intersections of Belt Line Road & Addison Road, Belt Line Road & Beltway Drive, and Addison Road & Sojourn Drive. The improvements include, but are not limited to, traffic signal construction, curb ramp construction, sidewalk construction, median nose construction, and landscape/irrigation improvements

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 34 - Transportation, Transportation Signaling and Control Equipment, Roadway Signaling and Control Equipment, Traffic Signals, Traffic Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents