Similar Projects
Last Updated | 12/19/2019 12:35 PM |
Project Title | Chapman Raw Water Transmission Pipeline Channel Stabilization at the South Sulphur River Crossing Phase 2 |
Physical Address | View project details and contacts |
City, State (County) | Wylie, TX 75098 (Collin County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Shoreline/Erosion/Drainage |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | $783,000 |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Mitigate channel erosion at the South Sulphur River and Champman Raw Water Transmission Pipeline crossing by constructing a sheet pile wall, placing rock rip rap and permanent turf reinforcement matting, and installing a new articulated concrete block low water crossing. |
||||
Details |
|
||||
Bidder's List | View project details and contacts | ||||
Prospective Bidders | View project details and contacts | ||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |