Similar Projects
Turner Brewer Septic and WPS
Alteration
Design
$25,000 to $100,000 est. value
Roy, WA

Contractor - McGimpsey Septic and Community Water System (CWS) - Clallam County, WA
Infrastructure
Design
$25,000 to $100,000 est. value
Neah Bay, WA

Georgeville Wastewater System Corrections
Infrastructure
Bidding
$25,000 to $1,000,000 est. value
Goldendale, WA 98620

Sewer (Phase II) Improvements
Infrastructure
Bidding
$3,530,000 est. value
Toppenish, WA

Value Planning Analysis Services - The City of Palouse
Term Contract, Alteration
Post-Bid
Palouse, WA

Allen Road Sanitary Sewer Improvements
Infrastructure
Post-Bid
$225,000 est. value
Roy, WA 98580

Southside Interceptor CIPP Sewer Rehabilitation Phase 2
Infrastructure
Results
$1,662,108 est. value
Vancouver, WA 98687

Exposed Sewer Pipe Repairs - Site 5
Infrastructure
Results
$3,200,000 to $3,700,000 est. value
Bothell, WA 98011

Septic System for Individual Homeowner in Skagit County
Infrastructure
Design
$25,000 to $100,000 est. value
Sedro-Woolley, WA 98284

Supply, Install, Connect Utilities for a Four-bedroom, Two Bathroom Manufactured Housing Unit
Renovation, Infrastructure
Bidding
$420,000 est. value
WA

Highlands and Northwest Interceptor Sewer Rehabilitation
Infrastructure
Post-Bid
$1,206,033 est. value
Kennewick, WA 99336

Mcmillin Reservoir Onsite Septic System Holding Tank Construction for Comfort Station
Infrastructure
Results
WA 98374

Myers Street Sewer Extension
Infrastructure
Bidding
$25,000 to $50,000 est. value
Eastsound, WA 98245

Continuous Steel Sewer Rod - Value Blanket
Infrastructure, Alteration
Post-Bid
Spokane, WA

Mercer Island and Enatai Interceptor Upgrade-Conveyance Improvements
Infrastructure
Results
$52,417,000 est. value
WA

Last Updated 06/29/2022 11:50 PM
Project Title

Lift Station 18 Upgrade - Phase I Forcemain Improvements

Physical Address View project details and contacts
City, State (County) Normandy Park, WA 98166   (King County)
Category(s) Sewer and Water
Sub-Category(s) Sanitary Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $715,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Install approximately 1,900 LF of 6 inch HDPE forcemain by horizontal directional drilling along with pigging stations and manhole connections. Work to include traffic control as required. Location: SW Normandy Terrace, approximately 900 feet south of the SW Normandy Terrace/Marine View Drive SW intersection in Normandy Park, WA.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents