Similar Projects
RFP Design - Design Plans for Pickles Butte Sanitary Landfill Gas Collection Project
Alteration
Conception
Boise, ID

Brundage Estates Residential Subdivision
New Construction, Infrastructure
Conception
$70,000,000 CJ est. value
Meridian, ID 83642

RFQ D/B - Student Residence Hall
New Construction, Infrastructure
Design
$4,181,379 CJ est. value
Boise, ID 83706

Lewiston Regional Office Facility Improvements - Phase II
New Construction, Infrastructure, Renovation
Design
$1,000,000 CJ est. value
Boise, ID 83702

Blue Sky Orchard Water Production Well
Infrastructure
Bidding
$2,000,000 CJ est. value
Boise, ID 83702

Blue Sky Orchard Water Production Well
Infrastructure
Bidding
$2,000,000 CJ est. value
Boise, ID 83702

Landfill NRC3 Lift C Horizontals Materials Purchase
Infrastructure
Post-Bid
ID

State Highway 16 Water Main Improvements
Infrastructure
Post-Bid
Meridian, ID 83646

Parkcenter Park Pump Station Improvements
Renovation
Results
Boise, ID 83706

Watermain Replacement Hickory - Pine-Fairview
Infrastructure
Results
Meridian, Pine, ID 83642

ICCU Downtown Tower
New Construction, Infrastructure
Pending Verification
$73,000,000 CJ est. value
Boise, ID 83702

Idaho Street Mixed-Use Building
New Construction, Infrastructure
Pending Verification
$100,000,000 CJ est. value
Boise, ID 83702

Amity Road and Maple Grove Road Roundabout - Ada County Highway District
Infrastructure
Conception
$652,000 CJ est. value
Boise, ID 83709

Julia Davis River Node Memorial Construction
Infrastructure
Design
$600,000 CJ est. value
Boise, ID 83702

Gorilla Mind Warehouse & Office
New Construction, Infrastructure - 39,500 SF
Bidding
$5,000,000 CJ est. value
Meridian, ID 83642

Last Updated 09/08/2022 11:02 AM
Project Title

Spring Valley Wells No.1 & No.2 with Booster

Physical Address View project details and contacts
City, State (County) Meridian, ID 83642   (Ada County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Results, Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $6,482,658 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The Project Includes the Following Work: In Accordance With the Plans and Specifications, This Work Consists of the Construction of Municipal Wells No.1 & No.2, Including Pumps, Well House Structures, and Booster Station No.1 for the Spring Valley Phase 1 Water System. Work Generally Includes Vertical Well Turbine Pumps, Motor and Column Pipe, Earthwork, Grading and Stormwater Systems at Each Site, Construction of Access With Gravel and Asphalt Surfacing to Each Site, Construction of Enclosure Structures Including Mechanical, Electrical, Controls, Associated Piping and Other Water System Appurtenances at Each Site, and Installation of Stand-by Generators With Associated Appurtenances at Each Site. Project Has an Expected Duration of 270 Calendar Days. Instructions to Bidders For All Further Requirements Regarding Bid Submittal, Qualifications, Procedures, and Contract Award, Refer to the Instructions to Bidders That Are Included in the Bidding Documents. Bids Must Be Accompanied by Bid Security in the Form of a Bid Bond, Certified Check, Cashiers Check or Cash in the Amount of 5% of the Amount of the Bid Proposal. Said Bid Security Shall Be Forfeited to Spring Valley Community Infrastructure District as Liquidated Damages Should the Successful Bidder Fail to Enter Into Contract in Accordance With Their Proposal as Specified in the Instructions to Bidders. Spring Valley Community Infrastructure District Reserves the Right to Reject Any or All Proposals, Waive Any Nonmaterial Irregularities in the Bids Received, and to Accept the Proposal Deemed Most Advantageous to the Best Interest of Spring Valley Community Infrastructure District .

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents