Similar Projects
AC Surfacing - SD 73
Infrastructure
Conception
$6,936,000 CJ est. value
Kadoka, SD 57543

AC Surfacing - SD 73
Infrastructure
Conception
$6,936,000 CJ est. value
Kadoka, SD 57543

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

MicroSurfacing
Infrastructure
Post-Bid
$629,000 CJ est. value
Kadoka, SD 57543

Asphalt Surface Treatment and Rout and Seal
Infrastructure
Results
$3,928,000 est. value

Rout and Seal - Winner Area
Infrastructure
Results
$1,105,000 est. value
Kadoka, Mellette, SD 57461

LSDC Overlay, Joints, Approach Surfacing, Guardrail - I 90 E
Infrastructure
Conception
$1,824,000 CJ est. value
Kadoka, SD 57543

Modify Cross roads
Infrastructure
Results
$1,311,225 CJ est. value
Kadoka, SD 57543

Replace Str RCBC, Approach Grading - SD 248
Demolition, New Construction, Infrastructure
Conception
$2,401,000 CJ est. value
Kadoka, SD 57543

Last Updated 08/14/2023 11:13 AM
Project Title

Rehab 6 Asphalt and 2 Gravel Pullouts Badlands National Park

Physical Address View project details and contacts
City, State (County) Interior, SD 57750   (Jackson County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Park/Playground, Paving/Reconstruction, Shoreline/Erosion/Drainage, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Request for Qualifications, Construction start expected July 2023
Bids Due View project details and contacts
Estimated Value $1,000,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The installation of pullouts at eight (8) separate locations as indicated on the provided plan sets 6 locations with asphalt paving and 2 with gravel surfacing. The work will require site grading and surfacing placement in each area for visitor parking expansion. This will require placement, compaction, and finishing of the new surfacing to achieve appropriate final grade. In those sites where asphalt placement is required, the contractor shall place specified asphalt to the extents indicated on each plan sheet with curb and gutter as indicated Culvert extensions are required in two locations. All specifications documents/drawings will be provided if/when the government proceeds with a formal solicitation. Notice to Offerors: Funds are being allocated for this requirement. No award will be made under this solicitation until funds are available. An amendment to the solicitation will be posted when the requirement is fully funded. This is a invitation for bids. The resulting contract is expected to be a firm fixed price construction contract. The complete specifications, drawings, provisions and clauses are available on http://www.sam.gov. Project Description: The installation of pullouts at eight (8) separate locations as indicated on the provided plan sets 6 locations with asphalt paving and 2 with gravel surfacing. The work will require site grading and surfacing placement in each area for visitor parking expansion. This will require placement, compaction, and finishing of the new surfacing to achieve appropriate final grade. In those sites where asphalt placement is required, the contractor shall place specified asphalt to the extents indicated on each plan sheet with curb and gutter as indicated culvert extensions are required in two locations.

Details

Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 31 - Earthwork, Selective Clearing, Grading, Erosion and Sedimentation Controls, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 34 - Transportation, Operation and Maintenance of Transportation.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents